Assessment Year | 2024 |
---|---|
Principal Product | chemicals |
NAICS | 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing |
SIC | 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 78 |
Plant Area |
2,679,915
ft2
|
Annual Production | 45,000,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,437,617 | 26,244,000 |
kWh
|
$0.055 |
Electricity Demand | $293,210 | 48,232 |
kW-mo/yr
|
$6.08 |
Natural Gas | $6,031,268 | 1,889,561 |
MMBtu
|
$3.19 |
TOTAL YEARLY COSTS | $7,762,095 | |||
RECOMMENDED SAVINGS* | $214,282 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $1,382 | $165 |
$1,382
25,125
kWh
|
- | - | |
02 | 2.2113: Repair or replace steam traps | $5,037 | $2,600 | - | - |
$5,037
-
MMBtu
|
|
03 | 2.8117: Install sub-metering equipment | $13,250 | $9,000 |
$7,217
131,200
kWh
|
- |
$6,033
-
MMBtu
|
|
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $162,757 | $116,320 |
$162,757
2,959,227
kWh
|
- | - | |
05 | 2.1116: Improve combustion control capability | $18,443 | $20,000 | - | - |
$18,443
-
MMBtu
|
|
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,911 | $2,088 |
$1,340
24,361
kWh
|
$571
-
kW-mo/yr
|
- | |
07 | 2.4224: Upgrade controls on compressors | $11,502 | $18,750 |
$11,502
209,119
kWh
|
- | - | |
TOTAL RECOMMENDED | $214,282 | $168,923 |
$184,198
3,349,032
kWh
|
$571
-
kW-mo/yr
|
$29,513
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs