ITAC Assessment: LS2409
ITAC logo
ITAC Assessment: LS2409
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product chemicals
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 78
Plant Area 2,679,915
ft2
Annual Production 45,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,437,617 26,244,000
kWh
Electricity Demand $293,210 48,232
kW-mo/yr
Natural Gas $6,031,268 1,889,561
MMBtu
TOTAL YEARLY COSTS $7,762,095
RECOMMENDED SAVINGS* $214,282 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $1,382 $165 $1,382
25,125
kWh
- -
02 2.2113: Repair or replace steam traps $5,037 $2,600 - - $5,037
-
MMBtu
03 2.8117: Install sub-metering equipment $13,250 $9,000 $7,217
131,200
kWh
- $6,033
-
MMBtu
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $162,757 $116,320 $162,757
2,959,227
kWh
- -
05 2.1116: Improve combustion control capability $18,443 $20,000 - - $18,443
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,911 $2,088 $1,340
24,361
kWh
$571
-
kW-mo/yr
-
07 2.4224: Upgrade controls on compressors $11,502 $18,750 $11,502
209,119
kWh
- -
TOTAL RECOMMENDED $214,282 $168,923 $184,198
3,349,032
kWh
$571
-
kW-mo/yr
$29,513
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs