ITAC Assessment: LS2117
ITAC logo
ITAC Assessment: LS2117
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Steel Fabrication
NAICS 332420: Metal Tank (Heavy Gauge) Manufacturing
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $50
M
to 100
M
# of Employees 49
Plant Area 720,000
ft2
Annual Production 60,000,000
lb
Production Hrs. Annual 2,730
hrs
Location (State) Louisiana
View Case Study

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $366,346 3,525,943
kWh
Natural Gas $176,695 30,552
MMBtu
TOTAL YEARLY COSTS $543,041
RECOMMENDED SAVINGS* $110,422 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $104,067

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $4,901 $25 $4,901
47,121
kWh
- -
02 2.7261: Install timers and/or thermostats $1,670 $75 $1,670
16,061
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,638 $675 $8,638
83,055
kWh
- -
04 2.7124: Make a practice of turning off lights when not needed $1,552 $300 $1,552
14,920
kWh
- -
05 2.7135: Install occupancy sensors $504 $100 $504
4,850
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $12,700 $4,332 $12,700
122,116
kWh
- -
07 2.4226: Use / purchase optimum sized compressor $79,003 $63,000 $79,003
759,646
kWh
- -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $305 $318 $305
2,935
kWh
- -
09 2.2443: Re-use or recycle hot or cold process exhaust air $264 $1,400 - - $264
-
MMBtu
10 2.3212: Optimize plant power factor $885 $6,048 - $885 -
TOTAL RECOMMENDED $110,422 $76,273 $109,273
1,050,704
kWh
$885 $264
-
MMBtu
TOTAL IMPLEMENTED $104,067 $68,482 $104,067
1,000,648
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs