ITAC Assessment: LS2111
ITAC logo
ITAC Assessment: LS2111
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Beer
NAICS 312120: Breweries
SIC 2082: Malt Beverages
Sales Range less than $500
k
# of Employees 23
Plant Area 16,905
ft2
Annual Production 3,000
units
Production Hrs. Annual 4,524
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $53,955 530,133
kWh
Natural Gas $32,623 2,822
MMBtu
Waste Disposal Costs
Water Usage $31,032 3,615
Tgal
TOTAL YEARLY COSTS $117,610
RECOMMENDED SAVINGS* $5,089 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,413

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7261: Install timers and/or thermostats $1,141 $75 $1,141
11,183
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,953 $225 $1,953
19,150
kWh
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,413 $675 $1,413
13,852
kWh
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $118 $102 $118
1,154
kWh
05 2.7447: Install vinyl strip / high speed / air curtain doors $263 $240 $263
2,581
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $201 $540 $201
1,966
kWh
TOTAL RECOMMENDED $5,089 $1,857 $5,089
49,886
kWh
TOTAL IMPLEMENTED $3,413 $942 $3,413
33,453
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs