Assessment Year | 2007 |
---|---|
Principal Product | Fabricated Steel |
NAICS | 423510: Metal Service Centers and Other Metal Merchant Wholesalers |
SIC | 5051: Metals Service Centers and Offices |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
90,000
ft2
|
Annual Production | 40,000,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $47,637 | 1,408,800 |
kWh
|
$0.034 |
Electricity Demand | $13,770 | 4,035 |
kW-mo/yr
|
$3.41 |
Natural Gas | $32,177 | 3,474 |
MMBtu
|
$9.26 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $11,416 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,242 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $579 | $1,391 |
$485
14,352
kWh
|
$94
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,762 | $12,621 |
$3,986
117,936
kWh
|
$776
-
kW-mo/yr
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,004 | $3,247 |
$651
19,292
kWh
|
$353
-
kW-mo/yr
|
- | |
04 | 2.7135: Install occupancy sensors | $174 | $462 |
$174
4,341
kWh
|
- | - | |
05 | 2.4133: Use most efficient type of electric motors | $125 | $38 |
$104
3,081
kWh
|
$21
-
kW-mo/yr
|
- | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,312 | $25 |
$1,107
32,760
kWh
|
$205
-
kW-mo/yr
|
- | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,664 | $440 |
$1,393
41,207
kWh
|
$271
-
kW-mo/yr
|
- | |
08 | 2.7261: Install timers and/or thermostats | $1,796 | $450 | - | - |
$1,796
-
MMBtu
|
|
TOTAL RECOMMENDED | $11,416 | $18,674 |
$7,900
232,969
kWh
|
$1,720
-
kW-mo/yr
|
$1,796
-
MMBtu
|
||
TOTAL IMPLEMENTED | $11,242 | $18,212 |
$7,726
228,628
kWh
|
$1,720
-
kW-mo/yr
|
$1,796
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs