| Assessment Year | 2019 |
|---|---|
| Principal Product | Fabricated Pipe |
| NAICS | 332996: Fabricated Pipe and Pipe Fitting Manufacturing |
| SIC | 3498: Fabricated Pipe and Pipe Fittings |
| Sales Range | $50 M to 100M |
| # of Employees | 300 |
| Plant Area |
80,000
ft2
|
| Annual Production | 57,900
units
|
| Production Hrs. Annual | 2,600
hrs
|
| Location (State) | Louisiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $100,047 | 1,288,077 |
kWh
|
$0.078 | |
| Electricity Demand | $47,663 | 7,144 |
kW-mo/yr
|
$6.67 | |
| Waste Disposal Costs | |||||
| Water Usage | $1,828 | 925 |
Tgal
|
$1.98 | |
| TOTAL YEARLY COSTS | $149,538 | ||||
| RECOMMENDED SAVINGS* | $15,007 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $4,645 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.6231: Utilize controls to operate equipment only when needed | $3,599 | $164 |
$3,599
46,333
kWh
|
- | |
| 02 | 2.6218: Turn off equipment when not in use | $588 | - |
$588
7,574
kWh
|
- | |
| 03 | 2.7134: Use photocell controls | $294 | $226 |
$294
3,791
kWh
|
- | |
| 04 | 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings | $164 | $90 |
$164
2,118
kWh
|
- | |
| 05 | 2.7135: Install occupancy sensors | $168 | $135 |
$168
2,163
kWh
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,194 | $22,875 |
$7,300
93,990
kWh
|
$2,894
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $15,007 | $23,490 |
$12,113
155,969
kWh
|
$2,894
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $4,645 | $480 |
$4,645
59,816
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs