ITAC Assessment: LS1022
ITAC logo
ITAC Assessment: LS1022
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Petroleum Bulk Stations and Terminals
NAICS 424710: Petroleum Bulk Stations and Terminals
SIC 5171: Petroleum Bulk stations and Terminals
Sales Range less than $500
k
# of Employees 30
Plant Area 973,000
ft2
Annual Production 1
units
Production Hrs. Annual 8,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $120,924 1,540,600
kWh
Electricity Demand $23,299 5,652
kW-mo/yr
Natural Gas $356,621 71,882
MMBtu
Waste Disposal Costs
Water Usage $4,111 778
Tgal
TOTAL YEARLY COSTS $504,955
RECOMMENDED SAVINGS* $373,372 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $369,773

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 4.661: Level zero – install control systems for existing equipment $1,456 - - - - $1,456 -
02 2.7261: Install timers and/or thermostats $1,565 $88 $1,565
19,937
kWh
- - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,360 $270 $2,360
30,064
kWh
- - - -
04 2.7135: Install occupancy sensors $248 $50 $248
3,154
kWh
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $22,202 $12,065 $19,749
251,610
kWh
$2,453
-
kW-mo/yr
- - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $71,544 $66,750 $71,544
911,481
kWh
- - - -
07 2.2414: Use waste heat from hot flue gases to preheat $84,344 $218,400 - - $84,344
-
MMBtu
- -
08 2.1224: Replace boiler $186,054 $504,000 - - $186,054
-
MMBtu
- -
09 3.1291: Eliminate practice of mixing waste streams $3,599 $16,545 - - - - $3,599
TOTAL RECOMMENDED $373,372 $818,168 $95,466
1,216,246
kWh
$2,453
-
kW-mo/yr
$270,398
-
MMBtu
$1,456 $3,599
TOTAL IMPLEMENTED $369,773 $801,623 $95,466
1,216,246
kWh
$2,453
-
kW-mo/yr
$270,398
-
MMBtu
$1,456 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs