Assessment Year | 2022 |
---|---|
Principal Product | Petroleum Bulk Stations and Terminals |
NAICS | 424710: Petroleum Bulk Stations and Terminals |
SIC | 5171: Petroleum Bulk stations and Terminals |
Sales Range | less than $500 k |
# of Employees | 30 |
Plant Area |
973,000
ft2
|
Annual Production | 1
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $120,924 | 1,540,600 |
kWh
|
$0.078 | |
Electricity Demand | $23,299 | 5,652 |
kW-mo/yr
|
$4.12 | |
Natural Gas | $356,621 | 71,882 |
MMBtu
|
$4.96 | |
Waste Disposal Costs | |||||
Water Usage | $4,111 | 778 |
Tgal
|
$5.28 | |
TOTAL YEARLY COSTS | $504,955 | ||||
RECOMMENDED SAVINGS* | $373,372 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $369,773 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 4.661: Level zero – install control systems for existing equipment | $1,456 | - | - | - | - | $1,456 | - | |
02 | 2.7261: Install timers and/or thermostats | $1,565 | $88 |
$1,565
19,937
kWh
|
- | - | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,360 | $270 |
$2,360
30,064
kWh
|
- | - | - | - | |
04 | 2.7135: Install occupancy sensors | $248 | $50 |
$248
3,154
kWh
|
- | - | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $22,202 | $12,065 |
$19,749
251,610
kWh
|
$2,453
-
kW-mo/yr
|
- | - | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $71,544 | $66,750 |
$71,544
911,481
kWh
|
- | - | - | - | |
07 | 2.2414: Use waste heat from hot flue gases to preheat | $84,344 | $218,400 | - | - |
$84,344
-
MMBtu
|
- | - | |
08 | 2.1224: Replace boiler | $186,054 | $504,000 | - | - |
$186,054
-
MMBtu
|
- | - | |
09 | 3.1291: Eliminate practice of mixing waste streams | $3,599 | $16,545 | - | - | - | - | $3,599 | |
TOTAL RECOMMENDED | $373,372 | $818,168 |
$95,466
1,216,246
kWh
|
$2,453
-
kW-mo/yr
|
$270,398
-
MMBtu
|
$1,456 | $3,599 | ||
TOTAL IMPLEMENTED | $369,773 | $801,623 |
$95,466
1,216,246
kWh
|
$2,453
-
kW-mo/yr
|
$270,398
-
MMBtu
|
$1,456 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs