ITAC Assessment: TN0682
ITAC logo
ITAC Assessment: TN0682
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Small electric motors
NAICS
n/a
SIC 3621: Motors and Generators
Sales Range $5
M
to 10
M
# of Employees 175
Plant Area 65,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,818 1,944,607
kWh
Electricity Demand $43,034 5,389
kW-mo/yr
Electricity Fees $2,115 -
Natural Gas $48,328 7,874
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $134,115 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $67,600

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Gaseous Waste Savings Administrative Changes Savings Ancillary Material Cost Savings By-product Production Savings
01 3.5315: Lease / purchase baler; sell cardboard to recycler $37,600 $7,800 - - - $12,600
-
lb
- - - $25,000
02 4.321: Optimize production lot sizes and inventories $30,000 $26,000 - - - - - $30,000 - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $29,410 $49,230 $23,340
359,027
kWh
$6,070
-
kW-mo/yr
- - - - - -
04 3.8121: Cover containers to minimize evaporative losses $27,490 $300 - - - - $27,490
-
lb
- - -
05 2.7144: Install spectral reflectors / delamp $6,460 $3,340 $6,170
94,959
kWh
- - - - - $290 -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,650 $215 $1,960
30,188
kWh
$690
-
kW-mo/yr
- - - - - -
07 2.2514: Cover open tanks $505 $800 - - $505
-
MMBtu
- - - - -
TOTAL RECOMMENDED $134,115 $87,685 $31,470
484,174
kWh
$6,760
-
kW-mo/yr
$505
-
MMBtu
$12,600
-
lb
$27,490
-
lb
$30,000 $290 $25,000
TOTAL IMPLEMENTED $67,600 $33,800 - - - $12,600
-
lb
- $30,000 - $25,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Gaseous Waste Savings Administrative Changes Savings Ancillary Material Cost Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs