ITAC Assessment: UU0042
ITAC logo
ITAC Assessment: UU0042
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product vinyl windows and fencing
NAICS 331318: Other Aluminum Rolling, Drawing, and Extruding
SIC 3354: Aluminum Extruded Products
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 160,000
ft2
Annual Production 8,500,000
lb
Production Hrs. Annual 6,864
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $51,562 1,858,960
kWh
Electricity Demand $45,684 4,856
kW-mo/yr
Natural Gas $11,126 2,383
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,894 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $15,620 $8,000 - - $15,620 -
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,027 $1,500 $680
24,000
kWh
$347
-
kW-mo/yr
- -
03 2.4239: Eliminate or reduce compressed air usage $632 $550 $124
4,400
kWh
$508
-
kW-mo/yr
- -
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $9,960 - - $9,960
-
kW-mo/yr
- -
05 2.4133: Use most efficient type of electric motors $2,836 $20,051 $1,878
66,065
kWh
$958
-
kW-mo/yr
- -
06 2.4221: Install compressor air intakes in coolest locations $420 $406 $278
9,781
kWh
$142
-
kW-mo/yr
- -
07 2.2437: Recover waste heat from equipment $792 $2,296 - - - $792
-
MMBtu
08 2.2628: Utilize a less expensive cooling method $14,607 $100,240 $9,670
342,188
kWh
$4,937
-
kW-mo/yr
- -
TOTAL RECOMMENDED $45,894 $133,043 $12,630
446,434
kWh
$16,852
-
kW-mo/yr
$15,620 $792
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs