ITAC Assessment: LM0064
ITAC logo
ITAC Assessment: LM0064
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Steel Pipe
NAICS 332996: Fabricated Pipe and Pipe Fitting Manufacturing
SIC 3498: Fabricated Pipe and Pipe Fittings
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 1,742,400
ft2
Annual Production 50,000
ton
Production Hrs. Annual 4,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $503,537 4,924,600
kWh
Electricity Demand $150,047 15,612
kW-mo/yr
Electricity Fees $30,478 -
Natural Gas $46,249 7,952
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $876,137 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $424,294

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,721 $320 $5,810
54,520
kWh
$1,691
-
kW-mo/yr
- $(-780.0) -
02 2.4239: Eliminate or reduce compressed air usage $76,727 $9,000 n/a $55,166
517,890
kWh
$21,561
-
kW-mo/yr
- - -
03 2.4221: Install compressor air intakes in coolest locations $4,321 $200 $3,346
31,411
kWh
$975
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $16,099 $9,475 $12,465
117,020
kWh
$3,634
-
kW-mo/yr
- - -
05 2.7121: Utilize daylight whenever possible in lieu of artificial light $9,529 - $5,206
48,870
kWh
$4,323
-
kW-mo/yr
- - -
06 2.7144: Install spectral reflectors / delamp $2,520 - $1,951
18,320
kWh
$569
-
kW-mo/yr
- - -
07 2.1134: Eliminate leaks in combustible gas lines $453 $400 - - $453
-
MMBtu
- -
08 2.3131: Reschedule plant operations or reduce load to avoid peaks $13,674 $300 $17,724
-
kWh
- - $(-4,050.0) -
09 4.625: Develop standard operating procedures $123,760 $56,040 n/a - - - $123,760 -
10 4.611: Begin a practice of predictive / preventative maintenance $144,153 $2,500 $(-14,556.0)
(-246,230)
kWh
$(-7,773.0)
-
kW-mo/yr
$(-2,268.0)
-
MMBtu
$168,750 -
11 4.432: Cross-train personnel to avoid lost time $360,180 $118,080 - - - $360,180 -
12 4.421: Modify current incentive program $34,000 $5,000 - - - - $34,000
13 4.321: Optimize production lot sizes and inventories $84,000 $1,000 - - - - $84,000
TOTAL RECOMMENDED $876,137 $202,315 $87,112
541,801
kWh
$24,980
-
kW-mo/yr
$(-1,815.0)
-
MMBtu
$647,860 $118,000
TOTAL IMPLEMENTED $424,294 $133,475 $23,572
221,271
kWh
$6,869
-
kW-mo/yr
$453
-
MMBtu
$359,400 $34,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs