| Assessment Year | 2010 |
|---|---|
| Principal Product | Pressure Sensitive Tapes |
| NAICS | 322220: Paper Bag and Coated and Treated Paper Manufacturing |
| SIC | 2672: Coated and Laminated Paper, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 60 |
| Plant Area |
185,000
ft2
|
| Annual Production | 185
pieces
|
| Production Hrs. Annual | 7,488
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $255,344 | 6,325,200 |
kWh
|
$0.040 |
| Electricity Demand | $194,569 | 13,897 |
kW-mo/yr
|
$14.00 |
| Electricity Fees | $40,137 | - |
|
- |
| Natural Gas | $533,039 | 73,887 |
MMBtu
|
$7.21 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $314,529 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $219,741 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.1221: Replace obsolete burners with more efficient ones | $105,011 | $51,500 | - | - |
$105,011
-
MMBtu
|
- | - | |
| 02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $67,200 | $125 | - |
$67,200
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.2437: Recover waste heat from equipment | $62,913 | $70,000 | - | - |
$62,913
-
MMBtu
|
- | - | |
| 04 | 2.2437: Recover waste heat from equipment | $39,238 | $34,000 | - | - |
$39,238
-
MMBtu
|
- | - | |
| 05 | 2.1222: Install turbulators | $20,378 | $4,350 | - | - |
$20,378
-
MMBtu
|
- | - | |
| 06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $11,590 | $5,500 | - | - |
$11,590
-
MMBtu
|
- | - | |
| 07 | 2.7231: Use radiant heater for spot heating | $7,210 | $9,000 | - | - |
$7,210
-
MMBtu
|
- | - | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $989 | $1,727 |
$305
7,562
kWh
|
$145
-
kW-mo/yr
|
- | $380 | $159 | |
| TOTAL RECOMMENDED | $314,529 | $176,202 |
$305
7,562
kWh
|
$67,345
-
kW-mo/yr
|
$246,340
-
MMBtu
|
$380 | $159 | ||
| TOTAL IMPLEMENTED | $219,741 | $162,727 |
$305
7,562
kWh
|
$145
-
kW-mo/yr
|
$218,752
-
MMBtu
|
$380 | $159 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs