ITAC Assessment: LE0272
ITAC logo
ITAC Assessment: LE0272
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product rolled and coated aluminum
NAICS 331315: Aluminum Sheet, Plate, and Foil Manufacturing
SIC 3353: Aluminum Sheet, Plate, and Foil
Sales Range $10
M
to 50
M
# of Employees 154
Plant Area 250,000
ft2
Annual Production 20,800,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $540,554 11,567,403
kWh
Electricity Demand $262,201 36,184
kW-mo/yr
Natural Gas $928,287 80,380
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $248,900 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,361

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $130,841 $80,000 $95,490
2,031,706
kWh
$35,351
-
kW-mo/yr
- -
02 2.4226: Use / purchase optimum sized compressor $53,138 $6,600 $40,610
864,037
kWh
$12,528
-
kW-mo/yr
- -
03 2.7262: Separate controls of air handlers from ac/ heating systems $18,111 $40,000 - - $18,111
-
MMBtu
-
04 2.7262: Separate controls of air handlers from ac/ heating systems $17,652 $6,200 $1,174
24,976
kWh
$181
-
kW-mo/yr
$16,297
-
MMBtu
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $4,361 $272 $3,331
70,882
kWh
$1,030
-
kW-mo/yr
- -
06 2.7135: Install occupancy sensors $2,647 $480 $2,647
56,311
kWh
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $22,150 $92,543 $14,458
307,617
kWh
$5,285
-
kW-mo/yr
- $2,407
TOTAL RECOMMENDED $248,900 $226,095 $157,710
3,355,529
kWh
$54,375
-
kW-mo/yr
$34,408
-
MMBtu
$2,407
TOTAL IMPLEMENTED $4,361 $272 $3,331
70,882
kWh
$1,030
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs