ITAC Assessment: AS0574
ITAC logo
ITAC Assessment: AS0574
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product copper clad laminate for pcbs
NAICS 334419: Other Electronic Component Manufacturing
SIC 3672: Printed Circuit Boards
Sales Range $10
M
to 50
M
# of Employees 115
Plant Area 118,383
ft2
Annual Production 4,000,000
units
Production Hrs. Annual 6,214
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $473,267 5,839,200
kWh
Electricity Demand $59,402 11,622
kW-mo/yr
Electricity Fees $17,257 -
Natural Gas $84,974 13,580
MMBtu
TOTAL YEARLY COSTS $634,900
RECOMMENDED SAVINGS* $64,178 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.9114: Use solar heat to make electricty $29,273 $271,736 $28,947
357,376
kWh
$326
-
kW-mo/yr
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $20,540 $1,389 $18,409
227,276
kWh
$2,131
-
kW-mo/yr
- -
03 2.1233: Analyze flue gas for proper air/fuel ratio $12,135 $501 - - $12,395
-
MMBtu
$(-260.0)
04 2.6231: Utilize controls to operate equipment only when needed $1,317 $2,384 $1,317
16,263
kWh
- - -
05 2.7444: Close holes and openings in building such as broken windows $649 $152 $596
7,350
kWh
$53
-
kW-mo/yr
- -
06 2.6211: Conserve energy by efficient use of vending machines $264 $267 $234
2,883
kWh
$30
-
kW-mo/yr
- -
TOTAL RECOMMENDED $64,178 $276,429 $49,503
611,148
kWh
$2,540
-
kW-mo/yr
$12,395
-
MMBtu
$(-260.0)
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs