Assessment Year | 2024 |
---|---|
Principal Product | copper clad laminate for pcbs |
NAICS | 334419: Other Electronic Component Manufacturing |
SIC | 3672: Printed Circuit Boards |
Sales Range | $10 M to 50M |
# of Employees | 115 |
Plant Area |
118,383
ft2
|
Annual Production | 4,000,000
units
|
Production Hrs. Annual | 6,214
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $473,267 | 5,839,200 |
kWh
|
$0.081 |
Electricity Demand | $59,402 | 11,622 |
kW-mo/yr
|
$5.11 |
Electricity Fees | $17,257 | - |
|
- |
Natural Gas | $84,974 | 13,580 |
MMBtu
|
$6.26 |
TOTAL YEARLY COSTS | $634,900 | |||
RECOMMENDED SAVINGS* | $64,178 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $29,273 | $271,736 |
$28,947
357,376
kWh
|
$326
-
kW-mo/yr
|
- | - | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $20,540 | $1,389 |
$18,409
227,276
kWh
|
$2,131
-
kW-mo/yr
|
- | - | |
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $12,135 | $501 | - | - |
$12,395
-
MMBtu
|
$(-260.0) | |
04 | 2.6231: Utilize controls to operate equipment only when needed | $1,317 | $2,384 |
$1,317
16,263
kWh
|
- | - | - | |
05 | 2.7444: Close holes and openings in building such as broken windows | $649 | $152 |
$596
7,350
kWh
|
$53
-
kW-mo/yr
|
- | - | |
06 | 2.6211: Conserve energy by efficient use of vending machines | $264 | $267 |
$234
2,883
kWh
|
$30
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $64,178 | $276,429 |
$49,503
611,148
kWh
|
$2,540
-
kW-mo/yr
|
$12,395
-
MMBtu
|
$(-260.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs