ITAC Assessment: LL0240
ITAC logo
ITAC Assessment: LL0240
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Oilfield equipment--offshore platforms
NAICS 333132: Oil and Gas Field Machinery and Equipment Manufacturing
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $100
M
to 500
M
# of Employees 150
Plant Area 1,400,000
ft2
Annual Production 20,000
ton
Production Hrs. Annual 2,080
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,371,982 19,277,435
kWh
Electricity Demand $295,740 79,235
kW-mo/yr
Electricity Fees $82,268 -
Natural Gas $97,564 12,659
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $145,352 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $144,931

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7111: Reduce illumination to minimum necessary levels $40,093 $2,862 $35,199
494,583
kWh
$3,021
-
kW-mo/yr
$1,873 - - -
02 2.7134: Use photocell controls $28,394 $1,110 $27,068
380,323
kWh
- $1,326 - - -
03 2.4226: Use / purchase optimum sized compressor $24,138 $143,240 $19,989
280,861
kWh
$3,021
-
kW-mo/yr
$1,128 - - -
04 2.7261: Install timers and/or thermostats $15,054 $726 - - - $15,054
-
MMBtu
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,827 $12,200 $11,275
158,418
kWh
- $552 - - -
06 2.7135: Install occupancy sensors $2,004 $990 $1,910
26,834
kWh
- $94 - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,657 $1,050 $711
9,986
kWh
- $35 - $911 -
08 2.7224: Reduce space conditioning during non-working hours $421 $770 $401
5,633
kWh
- $20 - - -
09 4.611: Begin a practice of predictive / preventative maintenance $21,764 $230 $252
3,536
kWh
- $12 - $20,000 $1,500
TOTAL RECOMMENDED $145,352 $163,178 $96,805
1,360,174
kWh
$6,042
-
kW-mo/yr
$5,040 $15,054
-
MMBtu
$20,911 $1,500
TOTAL IMPLEMENTED $144,931 $162,408 $96,404
1,354,541
kWh
$6,042
-
kW-mo/yr
$5,020 $15,054
-
MMBtu
$20,911 $1,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs