ITAC Assessment: LE0617
ITAC logo
ITAC Assessment: LE0617
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product aerosols
NAICS 332439: Other Metal Container Manufacturing
SIC 2844: Perfumes, Cosmetics, and Other Toilet Preparations
Sales Range $50
M
to 100
M
# of Employees 68
Plant Area 45,000
ft2
Annual Production 42,000,000
units
Production Hrs. Annual 4,420
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $486,246 2,884,427
kWh
Electricity Demand $39,613 5,757
kW-mo/yr
Natural Gas $74,649 5,210
MMBtu
Waste Disposal Costs
Water Usage $50,342 95
Tgal
TOTAL YEARLY COSTS $650,850
RECOMMENDED SAVINGS* $380,774 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $137,524 - $108,422
641,550
kWh
$29,102
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $17,625 - $16,346
96,720
kWh
$1,279
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $66,793 $10,200 $60,147
355,899
kWh
$6,646
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $441 $296 $441
2,610
kWh
- -
05 2.2443: Re-use or recycle hot or cold process exhaust air $9,257 $7,500 - - $9,257
-
MMBtu
06 2.4221: Install compressor air intakes in coolest locations $7,303 $8,000 $6,573
38,869
kWh
$730
-
kW-mo/yr
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,955 $23,000 $8,964
53,040
kWh
$991
-
kW-mo/yr
-
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $61,818 $250,000 $55,668
329,402
kWh
$6,150
-
kW-mo/yr
-
09 2.6231: Utilize controls to operate equipment only when needed $32,528 $141,920 $28,821
170,897
kWh
$1,844
-
kW-mo/yr
$1,863
-
MMBtu
10 2.9112: Use solar heat to heat water $37,530 $282,800 $37,530
259,671
kWh
- -
TOTAL RECOMMENDED $380,774 $723,716 $322,912
1,948,658
kWh
$46,742
-
kW-mo/yr
$11,120
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs