ITAC Assessment: LE0608
ITAC logo
ITAC Assessment: LE0608
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Plastic Foam
NAICS 326150: Urethane and Other Foam Product (except Polystyrene) Manufacturing
SIC 3086: Plastics Foam Products
Sales Range $100
M
to 500
M
# of Employees 63
Plant Area 178,800
ft2
Annual Production 468,255
units
Production Hrs. Annual 3,120
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $383,826 3,274,622
kWh
Electricity Demand $45,543 17,625
kW-mo/yr
Electricity Fees $(-704.0) -
Natural Gas $68,800 12,938
MMBtu
TOTAL YEARLY COSTS $497,465
RECOMMENDED SAVINGS* $45,642 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,693 - $2,551
21,622
kWh
$142
-
kW-mo/yr
-
02 2.7261: Install timers and/or thermostats $9,619 - $1,627
13,903
kWh
- $7,992
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $20,628 $2,200 $19,364
165,496
kWh
$1,264
-
kW-mo/yr
-
04 2.4221: Install compressor air intakes in coolest locations $5,352 $4,000 $5,213
44,554
kWh
$139
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,119 $5,034 $1,913
15,940
kWh
$206
-
kW-mo/yr
-
06 2.2442: Preheat combustion air with waste heat $1,620 $7,750 $(-454.0)
(-3,879)
kWh
$(-46.0)
-
kW-mo/yr
$2,120
-
MMBtu
07 2.7142: Utilize higher efficiency lamps and/or ballasts $712 $3,905 $629
5,375
kWh
$83
-
kW-mo/yr
-
08 2.7233: Use properly designed and sized hvac equipment $2,899 $19,500 - - $2,899
-
MMBtu
TOTAL RECOMMENDED $45,642 $42,389 $30,843
263,011
kWh
$1,788
-
kW-mo/yr
$13,011
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs