ITAC Assessment: UA0197
ITAC logo
ITAC Assessment: UA0197
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Tea
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $50
M
to 100
M
# of Employees 95
Plant Area 85,000
ft2
Annual Production 39,000
Tgal
Production Hrs. Annual 6,440
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $327,935 5,560,800
kWh
Electricity Demand $199,208 13,623
kW-mo/yr
Electricity Fees $(-44,582.0) -
Natural Gas $204,209 18,308
MMBtu
Waste Disposal Costs
Water Usage $256,190 75,984
Tgal
TOTAL YEARLY COSTS $942,960
RECOMMENDED SAVINGS* $23,500 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,344

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,401 $5,562 $3,489
59,155
kWh
$1,711
-
kW-mo/yr
$201
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,943 $2,465 $4,062
68,910
kWh
$1,660
-
kW-mo/yr
$221
03 2.4231: Reduce the pressure of compressed air to the minimum required $6,667 $500 $4,390
74,437
kWh
$2,029
-
kW-mo/yr
$248
04 2.6218: Turn off equipment when not in use $5,489 - $5,285
89,629
kWh
- $204
TOTAL RECOMMENDED $23,500 $8,527 $17,226
292,131
kWh
$5,400
-
kW-mo/yr
$874
TOTAL IMPLEMENTED $11,344 $8,027 $7,551
128,065
kWh
$3,371
-
kW-mo/yr
$422
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs