ITAC Assessment: SF0112
ITAC logo
ITAC Assessment: SF0112
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Corrugated Containers
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 55,000
ft2
Annual Production 11,000
ton
Production Hrs. Annual 5,342
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $103,973 1,237,397
kWh
Electricity Demand $13,837 3,159
kW-mo/yr
Natural Gas $40,458 7,083
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $93,162 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,440 $12,207 n/a $6,440
76,788
kWh
- -
02 2.7144: Install spectral reflectors / delamp $494 $663 n/a $409
4,982
kWh
$85
-
kW-mo/yr
-
03 2.1213: Direct warmest air to combustion intake $223 $88 n/a $223
11,430
kWh
- -
04 3.4111: Use closed cycle process to minimize waste water production $16,103 $4,704 n/a $(-650.0)
(-6,741)
kWh
- $16,753
-
Tgal
05 3.4155: Meter waste water $69,902 $60,000 n/a - - $69,902
-
Tgal
TOTAL RECOMMENDED $93,162 $77,662 $6,422
86,459
kWh
$85
-
kW-mo/yr
$86,655
-
Tgal
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs