Assessment Year | 2006 |
---|---|
Principal Product | bread and buns |
NAICS | 311812: Commercial Bakeries |
SIC | 2051: Bread and Other Bakery Products, Except Cookies and Crackers |
Sales Range | $10 M to 50M |
# of Employees | 275 |
Plant Area |
150,000
ft2
|
Annual Production | 25,000
ton
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $312,524 | 5,579,635 |
kWh
|
$0.056 |
Electricity Demand | $25,914 | 9,238 |
kW-mo/yr
|
$2.81 |
Electricity Fees | $1,527 | - |
|
- |
Natural Gas | $483,866 | 493,682 |
MMBtu
|
$0.98 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $1,287,300 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,270,600 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|
01 | 4.111: Add equipment/ operators to reduce production bottleneck | $1,200,000 | $400,000 | - | - | $1,200,000 | |
02 | 2.1113: Reduce combustion air flow to optimum | $35,500 | $8,000 | - |
$35,500
-
MMBtu
|
- | |
03 | 2.2437: Recover waste heat from equipment | $10,500 | $7,340 | - |
$10,500
-
MMBtu
|
- | |
04 | 2.4223: Install direct acting units in place of compressed air pressure system in safety system | $14,400 | $13,700 |
$14,400
246,540
kWh
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $10,800 | - |
$10,800
195,150
kWh
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,300 | $6,300 |
$6,300
112,898
kWh
|
- | - | |
07 | 2.2622: Replace existing chiller with high efficiency model | $3,800 | $4,500 |
$3,800
65,900
kWh
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,600 | $5,000 |
$3,600
252
kWh
|
- | - | |
09 | 2.4131: Size electric motors for peak operating efficiency | $2,400 | $2,600 |
$2,400
44,500
kWh
|
- | - | |
TOTAL RECOMMENDED | $1,287,300 | $447,440 |
$41,300
665,240
kWh
|
$46,000
-
MMBtu
|
$1,200,000 | ||
TOTAL IMPLEMENTED | $1,270,600 | $433,000 |
$35,100
554,840
kWh
|
$35,500
-
MMBtu
|
$1,200,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs