ITAC Assessment: LE0600
ITAC logo
ITAC Assessment: LE0600
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Coated Products
NAICS 322220: Paper Bag and Coated and Treated Paper Manufacturing
SIC 2672: Coated and Laminated Paper, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 109
Plant Area 92,590
ft2
Annual Production 17,760,961
lb
Production Hrs. Annual 7,488
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $175,217 1,739,210
kWh
Electricity Demand $36,643 3,978
kW-mo/yr
Natural Gas $403,209 47,825
MMBtu
Waste Disposal Costs
Water Usage $8,586 19
Tgal
TOTAL YEARLY COSTS $623,655
RECOMMENDED SAVINGS* $157,281 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,082 - $962
9,522
kWh
$120
-
kW-mo/yr
-
02 2.7261: Install timers and/or thermostats $92,399 $480 $8,023
79,436
kWh
- $84,376
-
MMBtu
03 2.7135: Install occupancy sensors $6,925 $210 $6,925
68,560
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,149 $2,600 $11,685
115,697
kWh
$1,464
-
kW-mo/yr
-
05 2.2443: Re-use or recycle hot or cold process exhaust air $2,757 $2,500 - - $2,757
-
MMBtu
06 2.7233: Use properly designed and sized hvac equipment $14,877 $20,000 - - $14,877
-
MMBtu
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,555 $7,500 $4,937
48,878
kWh
$618
-
kW-mo/yr
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $16,572 $26,690 $14,362
142,197
kWh
$2,210
-
kW-mo/yr
-
09 2.4221: Install compressor air intakes in coolest locations $1,420 $4,000 $1,273
12,600
kWh
$147
-
kW-mo/yr
-
10 2.7232: Replace existing hvac unit with high efficiency model $2,545 $9,511 $2,342
23,184
kWh
$203
-
kW-mo/yr
-
TOTAL RECOMMENDED $157,281 $73,491 $50,509
500,074
kWh
$4,762
-
kW-mo/yr
$102,010
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs