ITAC Assessment: SF0538
ITAC logo
ITAC Assessment: SF0538
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product almonds
NAICS 311911: Roasted Nuts and Peanut Butter Manufacturing
SIC 2068: Salted and Roasted Nuts and Seeds
Sales Range $50
M
to 100
M
# of Employees 241
Plant Area 290,000
ft2
Annual Production 60,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,053,168 11,549,814
kWh
Electricity Demand $364,677 23,952
kW-mo/yr
Natural Gas $204,568 25,704
MMBtu
Waste Disposal Costs
Water Usage $17,112 749
Tgal
TOTAL YEARLY COSTS $1,639,525
RECOMMENDED SAVINGS* $508,453 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $96,672

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.8114: Change rate schedules or other changes in utility service $146,044 - - - $146,044 -
02 2.2621: Modify refrigeration system to operate at a lower pressure $29,680 $12,500 $29,680
325,507
kWh
- - -
03 2.7224: Reduce space conditioning during non-working hours $15,353 $5,947 $5,196
56,988
kWh
- - $10,157
-
MMBtu
04 2.2449: Recover heat from exhausted steam, hot air or hot water $27,526 $16,915 $31,896
349,814
kWh
$7,293
-
kW-mo/yr
- $(-11,663.0)
-
MMBtu
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,440 $7,616 $11,440
125,465
kWh
- - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,101 $5,998 $8,101
88,849
kWh
- - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $25,533 $34,367 $20,781
227,915
kWh
$4,752
-
kW-mo/yr
- -
08 2.4231: Reduce the pressure of compressed air to the minimum required $6,565 $11,649 $5,343
58,601
kWh
$1,222
-
kW-mo/yr
- -
09 2.9114: Use solar heat to make electricty $238,211 $1,672,972 $219,812
2,410,750
kWh
$18,399
-
kW-mo/yr
- -
TOTAL RECOMMENDED $508,453 $1,767,964 $332,249
3,643,889
kWh
$31,666
-
kW-mo/yr
$146,044 $(-1,506.0)
-
MMBtu
TOTAL IMPLEMENTED $96,672 $78,077 $80,541
883,325
kWh
$5,974
-
kW-mo/yr
- $10,157
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings