Assessment Year | 2009 |
---|---|
Principal Product | plastic buckets |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 65 |
Plant Area |
100,000
ft2
|
Annual Production | 2,000,000
units
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Puerto Rico |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $846,157 | 5,088,600 |
kWh
|
$0.17 |
Electricity Demand | $110,048 | 14,292 |
kW-mo/yr
|
$7.70 |
Electricity Fees | $5,460 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $120,509 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $93,655 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $35,760 | $860 |
$32,745
199,665
kWh
|
$3,015
-
kW-mo/yr
|
|
02 | 2.4226: Use / purchase optimum sized compressor | $26,854 | $30,000 |
$24,590
149,940
kWh
|
$2,264
-
kW-mo/yr
|
|
03 | 2.4323: Use optimum size and capacity equipment | $25,058 | $4,531 |
$23,328
142,514
kWh
|
$1,730
-
kW-mo/yr
|
|
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $9,607 | $40 |
$8,824
53,908
kWh
|
$783
-
kW-mo/yr
|
|
05 | 2.2136: Install / repair insulation on steam lines | $8,741 | $988 |
$8,017
48,883
kWh
|
$724
-
kW-mo/yr
|
|
06 | 2.2136: Install / repair insulation on steam lines | $4,995 | $480 |
$4,571
27,870
kWh
|
$424
-
kW-mo/yr
|
|
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,251 | $1,210 |
$3,991
24,382
kWh
|
$260
-
kW-mo/yr
|
|
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,586 | $1,672 |
$2,368
14,444
kWh
|
$218
-
kW-mo/yr
|
|
09 | 2.6218: Turn off equipment when not in use | $2,657 | $1,320 |
$2,437
14,860
kWh
|
$220
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $120,509 | $41,101 |
$110,871
676,466
kWh
|
$9,638
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $93,655 | $11,101 |
$86,281
526,526
kWh
|
$7,374
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs