ITAC Assessment: MI0176
ITAC logo
ITAC Assessment: MI0176
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product plastic buckets
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 100,000
ft2
Annual Production 2,000,000
units
Production Hrs. Annual 6,120
hrs
Location (State) Puerto Rico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $846,157 5,088,600
kWh
Electricity Demand $110,048 14,292
kW-mo/yr
Electricity Fees $5,460 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $120,509 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $93,655

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.6218: Turn off equipment when not in use $35,760 $860 $32,745
199,665
kWh
$3,015
-
kW-mo/yr
02 2.4226: Use / purchase optimum sized compressor $26,854 $30,000 $24,590
149,940
kWh
$2,264
-
kW-mo/yr
03 2.4323: Use optimum size and capacity equipment $25,058 $4,531 $23,328
142,514
kWh
$1,730
-
kW-mo/yr
04 2.4231: Reduce the pressure of compressed air to the minimum required $9,607 $40 $8,824
53,908
kWh
$783
-
kW-mo/yr
05 2.2136: Install / repair insulation on steam lines $8,741 $988 $8,017
48,883
kWh
$724
-
kW-mo/yr
06 2.2136: Install / repair insulation on steam lines $4,995 $480 $4,571
27,870
kWh
$424
-
kW-mo/yr
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,251 $1,210 $3,991
24,382
kWh
$260
-
kW-mo/yr
08 2.7142: Utilize higher efficiency lamps and/or ballasts $2,586 $1,672 $2,368
14,444
kWh
$218
-
kW-mo/yr
09 2.6218: Turn off equipment when not in use $2,657 $1,320 $2,437
14,860
kWh
$220
-
kW-mo/yr
TOTAL RECOMMENDED $120,509 $41,101 $110,871
676,466
kWh
$9,638
-
kW-mo/yr
TOTAL IMPLEMENTED $93,655 $11,101 $86,281
526,526
kWh
$7,374
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs