Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Motor Veichle parts
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 325
Plant Area 146,000
ft2
Annual Production 480,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $299,059 3,132,802
kWh
Electricity Demand $23,694 8,467
kW-mo/yr
Electricity Fees $2,760 -
Natural Gas $27,663 3,443
MMBtu
TOTAL YEARLY COSTS $353,176
RECOMMENDED SAVINGS* $135,994 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Product Savings
01 2.7261: Install timers and/or thermostats $12,747 - $7,893
83,086
kWh
- $4,854
-
MMBtu
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,635 $1,400 $2,495
26,247
kWh
$140
-
kW-mo/yr
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,253 $790 $1,186
12,480
kWh
$67
-
kW-mo/yr
- -
04 2.4226: Use / purchase optimum sized compressor $73,468 $68,000 $(-31,418.0)
(-330,720)
kWh
$(-1,781.0)
-
kW-mo/yr
- $106,667
05 2.7232: Replace existing hvac unit with high efficiency model $42,420 $96,793 $41,745
439,421
kWh
$675
-
kW-mo/yr
- -
06 2.7425: Clean or color roof to reduce solar load $3,471 $16,498 $3,298
34,710
kWh
$824
-
kW-mo/yr
$(-651.0)
-
MMBtu
-
TOTAL RECOMMENDED $135,994 $183,481 $25,199
265,224
kWh
$(-75.0)
-
kW-mo/yr
$4,203
-
MMBtu
$106,667
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs