Assessment Year | 2024 |
---|---|
Principal Product | Motor Veichle parts |
NAICS | 336390: Other Motor Vehicle Parts Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $10 M to 50M |
# of Employees | 325 |
Plant Area |
146,000
ft2
|
Annual Production | 480,000
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $299,059 | 3,132,802 |
kWh
|
$0.095 |
Electricity Demand | $23,694 | 8,467 |
kW-mo/yr
|
$2.80 |
Electricity Fees | $2,760 | - |
|
- |
Natural Gas | $27,663 | 3,443 |
MMBtu
|
$8.03 |
TOTAL YEARLY COSTS | $353,176 | |||
RECOMMENDED SAVINGS* | $135,994 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $12,747 | - |
$7,893
83,086
kWh
|
- |
$4,854
-
MMBtu
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,635 | $1,400 |
$2,495
26,247
kWh
|
$140
-
kW-mo/yr
|
- | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,253 | $790 |
$1,186
12,480
kWh
|
$67
-
kW-mo/yr
|
- | - | |
04 | 2.4226: Use / purchase optimum sized compressor | $73,468 | $68,000 |
$(-31,418.0)
(-330,720)
kWh
|
$(-1,781.0)
-
kW-mo/yr
|
- | $106,667 | |
05 | 2.7232: Replace existing hvac unit with high efficiency model | $42,420 | $96,793 |
$41,745
439,421
kWh
|
$675
-
kW-mo/yr
|
- | - | |
06 | 2.7425: Clean or color roof to reduce solar load | $3,471 | $16,498 |
$3,298
34,710
kWh
|
$824
-
kW-mo/yr
|
$(-651.0)
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $135,994 | $183,481 |
$25,199
265,224
kWh
|
$(-75.0)
-
kW-mo/yr
|
$4,203
-
MMBtu
|
$106,667 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs