ITAC Assessment: TT0030
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Metal Custom Retail Store Fixtures
NAICS 337215: Showcase, Partition, Shelving, and Locker Manufacturing
SIC 2542: Office and Store Fixtures, Partitions, Shelving, and Lockers, Except Wood
Sales Range $50
M
to 100
M
# of Employees 324
Plant Area 600,000
ft2
Annual Production 1
units
Production Hrs. Annual 4,000
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $377,053 9,208,800
kWh
Electricity Demand $150,235 29,700
kW-mo/yr
Electricity Fees $4,967 -
Natural Gas $334,521 36,272
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $123,000 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $99,250 $272,800 $51,100
1,190,400
kWh
$18,150
-
kW-mo/yr
$30,000
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $19,650 $2,900 $15,400
280,000
kWh
$4,250
-
kW-mo/yr
-
03 2.3212: Optimize plant power factor $4,100 $22,600 - - $4,100
TOTAL RECOMMENDED $123,000 $298,300 $66,500
1,470,400
kWh
$22,400
-
kW-mo/yr
$34,100
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs