ITAC Assessment: TT0176
ITAC logo
ITAC Assessment: TT0176
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Headliner, blowmolded ducts, and load floor panels
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 275
Plant Area 138,584
ft2
Annual Production 5,195,000
pieces
Production Hrs. Annual 4,125
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $985,338 18,448,100
kWh
Electricity Demand $414,868 38,722
kW-mo/yr
Natural Gas $31,004 5,031
MMBtu
Waste Disposal Costs
Water Usage $16,478 4,392,000
Tgal
Water Disposal $6,635 978
Tgal
TOTAL YEARLY COSTS $1,454,323
RECOMMENDED SAVINGS* $121,373 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $121,373

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4224: Upgrade controls on compressors $89,975 $250 $72,479
1,367,520
kWh
$17,496
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $21,541 $46,932 $18,648
351,866
kWh
$2,893
-
kW-mo/yr
03 2.7122: Disconnect ballasts $9,857 $1,000 $7,373
139,104
kWh
$2,484
-
kW-mo/yr
TOTAL RECOMMENDED $121,373 $48,182 $98,500
1,858,490
kWh
$22,873
-
kW-mo/yr
TOTAL IMPLEMENTED $121,373 $48,182 $98,500
1,858,490
kWh
$22,873
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs