ITAC Assessment: LE0576
ITAC logo
ITAC Assessment: LE0576
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product electronic connectors
NAICS 335931: Current-Carrying Wiring Device Manufacturing
SIC 3678: Electronic Connectors
Sales Range $100
M
to 500
M
# of Employees 239
Plant Area 108,000
ft2
Annual Production 310,433
units
Production Hrs. Annual 4,212
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $344,582 6,248,000
kWh
Electricity Demand $97,436 18,912
kW-mo/yr
Electricity Fees $56,795 -
Natural Gas $18,544 1,784
MMBtu
TOTAL YEARLY COSTS $517,357
RECOMMENDED SAVINGS* $426,075 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.7261: Install timers and/or thermostats $8,432 - $5,637
102,488
kWh
- $2,795
-
MMBtu
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $3,203 - $2,467
44,863
kWh
$736
-
kW-mo/yr
- -
03 2.7135: Install occupancy sensors $486 $75 $486
8,829
kWh
- - -
04 2.2443: Re-use or recycle hot or cold process exhaust air $14,556 $2,500 - - $14,556
-
MMBtu
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,123 $560 $2,604
47,349
kWh
$519
-
kW-mo/yr
- -
06 2.2443: Re-use or recycle hot or cold process exhaust air $8,208 $2,500 - - $8,208
-
MMBtu
-
07 2.4221: Install compressor air intakes in coolest locations $3,633 $4,000 $3,303
60,060
kWh
$330
-
kW-mo/yr
- -
08 2.4221: Install compressor air intakes in coolest locations $2,069 $4,000 $1,858
33,779
kWh
$211
-
kW-mo/yr
- -
09 2.7232: Replace existing hvac unit with high efficiency model $17,682 $55,039 $16,817
305,760
kWh
$865
-
kW-mo/yr
- -
10 2.9114: Use solar heat to make electricty $54,887 $613,200 $31,767
577,586
kWh
- - $23,120
11 2.9114: Use solar heat to make electricty $309,796 $3,462,200 $179,356
3,261,024
kWh
- - $130,440
TOTAL RECOMMENDED $426,075 $4,144,074 $244,295
4,441,738
kWh
$2,661
-
kW-mo/yr
$25,559
-
MMBtu
$153,560
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings