Assessment Year | 2024 |
---|---|
Principal Product | metal forming |
NAICS | 332322: Sheet Metal Work Manufacturing |
SIC | 3444: Sheet Metal Work |
Sales Range | $1 M to 5M |
# of Employees | 40 |
Plant Area |
60,000
ft2
|
Annual Production | 550
units
|
Production Hrs. Annual | 3,380
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $87,481 | 748,651 |
kWh
|
$0.12 | |
Electricity Demand | $16,564 | 3,239 |
kW-mo/yr
|
$5.11 | |
Electricity Fees | $3,375 | - |
|
- | |
Natural Gas | $168,224 | 23,429 |
MMBtu
|
$7.18 | |
Waste Disposal Costs | |||||
Water Usage | $8,290 | 852,000 |
Tgal
|
$0.010 | |
TOTAL YEARLY COSTS | $283,934 | ||||
RECOMMENDED SAVINGS* | $117,275 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $79,603 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $11,872 | $2,400 |
$11,872
101,924
kWh
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $20,430 | $5,760 |
$17,685
151,174
kWh
|
$2,745
-
kW-mo/yr
|
- | |
03 | 2.4322: Use or replace with energy efficient substitutes | $32,332 | $69,375 | - | - |
$32,332
-
MMBtu
|
|
04 | 2.4226: Use / purchase optimum sized compressor | $13,704 | $32,395 |
$11,864
101,400
kWh
|
$1,840
-
kW-mo/yr
|
- | |
05 | 2.7232: Replace existing hvac unit with high efficiency model | $14,969 | $45,000 |
$14,616
124,925
kWh
|
$353
-
kW-mo/yr
|
- | |
06 | 4.652: Replace existing equipment with more suitable substitutes | $23,968 | $911,000 |
$3,407
29,120
kWh
|
$981
-
kW-mo/yr
|
$19,580
-
MMBtu
|
|
TOTAL RECOMMENDED | $117,275 | $1,065,930 |
$59,444
508,543
kWh
|
$5,919
-
kW-mo/yr
|
$51,912
-
MMBtu
|
||
TOTAL IMPLEMENTED | $79,603 | $122,535 |
$44,173
378,023
kWh
|
$3,098
-
kW-mo/yr
|
$32,332
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs