ITAC Assessment: LE0574
ITAC logo
ITAC Assessment: LE0574
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product metal forming
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area 60,000
ft2
Annual Production 550
units
Production Hrs. Annual 3,380
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,481 748,651
kWh
Electricity Demand $16,564 3,239
kW-mo/yr
Electricity Fees $3,375 -
Natural Gas $168,224 23,429
MMBtu
Waste Disposal Costs
Water Usage $8,290 852,000
Tgal
TOTAL YEARLY COSTS $283,934
RECOMMENDED SAVINGS* $117,275 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $79,603

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $11,872 $2,400 $11,872
101,924
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $20,430 $5,760 $17,685
151,174
kWh
$2,745
-
kW-mo/yr
-
03 2.4322: Use or replace with energy efficient substitutes $32,332 $69,375 - - $32,332
-
MMBtu
04 2.4226: Use / purchase optimum sized compressor $13,704 $32,395 $11,864
101,400
kWh
$1,840
-
kW-mo/yr
-
05 2.7232: Replace existing hvac unit with high efficiency model $14,969 $45,000 $14,616
124,925
kWh
$353
-
kW-mo/yr
-
06 4.652: Replace existing equipment with more suitable substitutes $23,968 $911,000 $3,407
29,120
kWh
$981
-
kW-mo/yr
$19,580
-
MMBtu
TOTAL RECOMMENDED $117,275 $1,065,930 $59,444
508,543
kWh
$5,919
-
kW-mo/yr
$51,912
-
MMBtu
TOTAL IMPLEMENTED $79,603 $122,535 $44,173
378,023
kWh
$3,098
-
kW-mo/yr
$32,332
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs