ITAC Assessment: LE0566
ITAC logo
ITAC Assessment: LE0566
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Chemical products
NAICS 424690: Other Chemical and Allied Products Merchant Wholesalers
SIC 5169: Chemicals and Allied Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 92
Plant Area 65,000
ft2
Annual Production 4,500
units
Production Hrs. Annual 4,992
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $75,402 1,453,238
kWh
Electricity Demand $22,362 6,235
kW-mo/yr
Electricity Fees $5,097 -
Natural Gas $52,335 7,714
MMBtu
Waste Disposal Costs
Water Usage $4,651 805
Tgal
Water Disposal $5,207 697
Tgal
TOTAL YEARLY COSTS $165,054
RECOMMENDED SAVINGS* $23,920 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4224: Upgrade controls on compressors $6,466 $600 $5,906
113,568
kWh
$560
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,026 $100 $936
17,996
kWh
$90
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,974 $1,450 $4,543
87,360
kWh
$431
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,023 $1,320 $3,674
70,665
kWh
$349
-
kW-mo/yr
-
05 2.7261: Install timers and/or thermostats $1,530 $640 $723
13,911
kWh
- $807
-
MMBtu
06 2.7135: Install occupancy sensors $403 $210 $403
7,743
kWh
- -
07 2.2443: Re-use or recycle hot or cold process exhaust air $1,444 $1,000 - - $1,444
-
MMBtu
08 2.7232: Replace existing hvac unit with high efficiency model $4,054 $17,765 $3,907
75,130
kWh
$147
-
kW-mo/yr
-
TOTAL RECOMMENDED $23,920 $23,085 $20,092
386,373
kWh
$1,577
-
kW-mo/yr
$2,251
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs