Assessment Year | 2023 |
---|---|
Principal Product | Pumps |
NAICS | 333996: Fluid Power Pump and Motor Manufacturing |
SIC | 3561: Pumps and Pumping Equipment |
Sales Range | $5 M to 10M |
# of Employees | 200 |
Plant Area |
130,000
ft2
|
Annual Production | 95,000
units
|
Production Hrs. Annual | 6,552
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $117,053 | 1,779,420 |
kWh
|
$0.066 |
Electricity Demand | $26,128 | 4,805 |
kW-mo/yr
|
$5.44 |
Electricity Fees | $12,765 | - |
|
- |
Natural Gas | $15,146 | 1,872 |
MMBtu
|
$8.09 |
TOTAL YEARLY COSTS | $171,092 | |||
RECOMMENDED SAVINGS* | $19,975 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,811 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,456 | $100 |
$1,265
19,175
kWh
|
$191
-
kW-mo/yr
|
- | |
02 | 2.7261: Install timers and/or thermostats | $5,982 | $1,900 |
$5,982
90,636
kWh
|
- | - | |
03 | 2.2443: Re-use or recycle hot or cold process exhaust air | $3,216 | $2,500 |
$2,903
43,990
kWh
|
$313
-
kW-mo/yr
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,252 | $2,480 |
$1,089
16,496
kWh
|
$163
-
kW-mo/yr
|
- | |
05 | 2.7241: Install outside air damper / economizer on hvac unit | $4,649 | $17,000 |
$4,497
68,141
kWh
|
$152
-
kW-mo/yr
|
- | |
06 | 2.4221: Install compressor air intakes in coolest locations | $299 | $1,500 |
$240
3,651
kWh
|
$59
-
kW-mo/yr
|
- | |
07 | 2.7232: Replace existing hvac unit with high efficiency model | $3,121 | $45,050 |
$1,329
20,135
kWh
|
$109
-
kW-mo/yr
|
$1,683
-
MMBtu
|
|
TOTAL RECOMMENDED | $19,975 | $70,530 |
$17,305
262,224
kWh
|
$987
-
kW-mo/yr
|
$1,683
-
MMBtu
|
||
TOTAL IMPLEMENTED | $11,811 | $49,530 |
$9,665
146,442
kWh
|
$463
-
kW-mo/yr
|
$1,683
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs