| Assessment Year | 2022 |
|---|---|
| Principal Product | lids |
| NAICS | 332119: Metal Crown, Closure, and Other Metal Stamping (except Automotive) |
| SIC | 3466: Crowns and Closures |
| Sales Range | $50 M to 100M |
| # of Employees | 130 |
| Plant Area |
151,000
ft2
|
| Annual Production | 1,000,000,000
units
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $906,525 | 16,723,400 |
kWh
|
$0.054 |
| Electricity Demand | $67,524 | 26,480 |
kW-mo/yr
|
$2.55 |
| Electricity Fees | $63,969 | - |
|
- |
| Natural Gas | $854,928 | 148,685 |
MMBtu
|
$5.75 |
| TOTAL YEARLY COSTS | $1,892,946 | |||
| RECOMMENDED SAVINGS* | $302,436 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $247,075 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.8114: Change rate schedules or other changes in utility service | $167,234 | - | - | - | - | $167,234 | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $18,776 | $15,000 |
$17,631
326,532
kWh
|
$1,145
-
kW-mo/yr
|
- | - | |
| 03 | 2.7261: Install timers and/or thermostats | $825 | $570 |
$387
7,160
kWh
|
- |
$438
-
MMBtu
|
- | |
| 04 | 2.2443: Re-use or recycle hot or cold process exhaust air | $6,501 | $7,500 | - | - |
$6,501
-
MMBtu
|
- | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $6,193 | $7,500 |
$5,816
107,689
kWh
|
$377
-
kW-mo/yr
|
- | - | |
| 06 | 2.2442: Preheat combustion air with waste heat | $23,891 | $70,000 |
$(-3,759.0)
(-65,372)
kWh
|
- |
$27,650
-
MMBtu
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $21,096 | $67,533 |
$19,811
366,868
kWh
|
$1,285
-
kW-mo/yr
|
- | - | |
| 08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $57,920 | $245,000 |
$54,156
1,002,902
kWh
|
$3,764
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $302,436 | $413,103 |
$94,042
1,745,779
kWh
|
$6,571
-
kW-mo/yr
|
$34,589
-
MMBtu
|
$167,234 | ||
| TOTAL IMPLEMENTED | $247,075 | $313,103 |
$74,354
1,376,930
kWh
|
$5,049
-
kW-mo/yr
|
$438
-
MMBtu
|
$167,234 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs