ITAC Assessment: SD0431
ITAC logo
ITAC Assessment: SD0431
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Sheet Metal HVAC Duct
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 70,000
ft2
Annual Production 456,000
lb
Production Hrs. Annual 3,570
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,109 473,892
kWh
Electricity Demand $12,009 1,427
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,715 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,286

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7121: Utilize daylight whenever possible in lieu of artificial light $213 - $213
2,097
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,286 $500 $834
8,218
kWh
$452
-
kW-mo/yr
03 2.7135: Install occupancy sensors $89 $98 $89
881
kWh
-
04 2.2614: Use cooling tower or economizer to replace chiller cooling $817 $2,000 $817
8,051
kWh
-
05 2.7425: Clean or color roof to reduce solar load $4,310 $10,000 $4,310
42,467
kWh
-
TOTAL RECOMMENDED $6,715 $12,598 $6,263
61,714
kWh
$452
-
kW-mo/yr
TOTAL IMPLEMENTED $1,286 $500 $834
8,218
kWh
$452
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs