| Assessment Year | 2022 |
|---|---|
| Principal Product | Metal Cabinets |
| NAICS | 337214: Office Furniture (except Wood) Manufacturing |
| SIC | 2522: Office Furniture, Except Wood |
| Sales Range | $10 M to 50M |
| # of Employees | 50 |
| Plant Area |
160,000
ft2
|
| Annual Production | 75,000,000
lb
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $99,080 | 1,578,750 |
kWh
|
$0.063 | |
| Electricity Demand | $19,891 | 4,996 |
kW-mo/yr
|
$3.98 | |
| Electricity Fees | $2,062 | - |
|
- | |
| Natural Gas | $134,200 | 22,829 |
MMBtu
|
$5.88 | |
| Waste Disposal Costs | |||||
| Solid Waste (non-haz) | $33,600 | 71,656 |
lb
|
$0.47 | |
| TOTAL YEARLY COSTS | $288,833 | ||||
| RECOMMENDED SAVINGS* | $56,186 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $11,356 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.8123: Pay utility bills on time | $672 | - | - | - | $672 | - | - | |
| 02 | 2.7261: Install timers and/or thermostats | $2,840 | $380 |
$363
5,759
kWh
|
- | - |
$2,477
-
MMBtu
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,176 | $2,600 |
$5,324
84,367
kWh
|
$852
-
kW-mo/yr
|
- | - | - | |
| 04 | 3.6123: Burn wood by-products for heat | $36,631 | $65,000 | - | - | - |
$2,831
-
MMBtu
|
$33,800
-
lb
|
|
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,439 | $4,040 |
$1,238
19,656
kWh
|
$201
-
kW-mo/yr
|
- | - | - | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $901 | $2,000 |
$775
12,307
kWh
|
$126
-
kW-mo/yr
|
- | - | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,405 | $16,445 |
$4,449
70,616
kWh
|
$956
-
kW-mo/yr
|
- | - | - | |
| 08 | 2.7233: Use properly designed and sized hvac equipment | $2,122 | $12,028 | - | - | - |
$2,122
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $56,186 | $102,493 |
$12,149
192,705
kWh
|
$2,135
-
kW-mo/yr
|
$672 |
$7,430
-
MMBtu
|
$33,800
-
lb
|
||
| TOTAL IMPLEMENTED | $11,356 | $9,020 |
$7,700
122,089
kWh
|
$1,179
-
kW-mo/yr
|
- |
$2,477
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs