Assessment Year | 2022 |
---|---|
Principal Product | Metal Cabinets |
NAICS | 337214: Office Furniture (except Wood) Manufacturing |
SIC | 2522: Office Furniture, Except Wood |
Sales Range | $10 M to 50M |
# of Employees | 50 |
Plant Area |
160,000
ft2
|
Annual Production | 75,000,000
lb
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $99,080 | 1,578,750 |
kWh
|
$0.063 | |
Electricity Demand | $19,891 | 4,996 |
kW-mo/yr
|
$3.98 | |
Electricity Fees | $2,062 | - |
|
- | |
Natural Gas | $134,200 | 22,829 |
MMBtu
|
$5.88 | |
Waste Disposal Costs | |||||
Solid Waste (non-haz) | $33,600 | 71,656 |
lb
|
$0.47 | |
TOTAL YEARLY COSTS | $288,833 | ||||
RECOMMENDED SAVINGS* | $56,186 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $11,356 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.8123: Pay utility bills on time | $672 | - | - | - | $672 | - | - | |
02 | 2.7261: Install timers and/or thermostats | $2,840 | $380 |
$363
5,759
kWh
|
- | - |
$2,477
-
MMBtu
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,176 | $2,600 |
$5,324
84,367
kWh
|
$852
-
kW-mo/yr
|
- | - | - | |
04 | 3.6123: Burn wood by-products for heat | $36,631 | $65,000 | - | - | - |
$2,831
-
MMBtu
|
$33,800
-
lb
|
|
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,439 | $4,040 |
$1,238
19,656
kWh
|
$201
-
kW-mo/yr
|
- | - | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $901 | $2,000 |
$775
12,307
kWh
|
$126
-
kW-mo/yr
|
- | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,405 | $16,445 |
$4,449
70,616
kWh
|
$956
-
kW-mo/yr
|
- | - | - | |
08 | 2.7233: Use properly designed and sized hvac equipment | $2,122 | $12,028 | - | - | - |
$2,122
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $56,186 | $102,493 |
$12,149
192,705
kWh
|
$2,135
-
kW-mo/yr
|
$672 |
$7,430
-
MMBtu
|
$33,800
-
lb
|
||
TOTAL IMPLEMENTED | $11,356 | $9,020 |
$7,700
122,089
kWh
|
$1,179
-
kW-mo/yr
|
- |
$2,477
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs