ITAC Assessment: LE0501
ITAC logo
ITAC Assessment: LE0501
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Display Boards
NAICS 321918: Other Millwork (including Flooring)
SIC 2431: Millwork
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 67,000
ft2
Annual Production 10,000
pieces
Production Hrs. Annual 4,264
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,775 1,113,300
kWh
Electricity Demand $15,306 3,778
kW-mo/yr
Electricity Fees $16,812 -
Natural Gas $12,550 1,461
MMBtu
TOTAL YEARLY COSTS $117,443
RECOMMENDED SAVINGS* $20,669 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,310

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,133 $100 $1,011
15,553
kWh
$122
-
kW-mo/yr
-
02 2.7261: Install timers and/or thermostats $985 $100 $418
6,429
kWh
- $567
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $560 $500 $499
7,677
kWh
$61
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,825 $20,000 $8,574
131,902
kWh
$1,251
-
kW-mo/yr
-
05 2.7263: Lower compressor pressure through a/c system modification $534 $1,240 $453
6,966
kWh
$81
-
kW-mo/yr
-
06 2.7232: Replace existing hvac unit with high efficiency model $7,632 $36,000 $7,259
111,681
kWh
$373
-
kW-mo/yr
-
TOTAL RECOMMENDED $20,669 $57,940 $18,214
280,208
kWh
$1,888
-
kW-mo/yr
$567
-
MMBtu
TOTAL IMPLEMENTED $10,310 $36,700 $9,187
141,340
kWh
$556
-
kW-mo/yr
$567
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs