ITAC Assessment: LE0484
ITAC logo
ITAC Assessment: LE0484
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Wastewater Equipment
NAICS 333911: Pump and Pumping Equipment Manufacturing
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 47
Plant Area 120,000
ft2
Annual Production 20,000
units
Production Hrs. Annual 3,120
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $108,227 1,293,130
kWh
Electricity Demand $36,394 5,647
kW-mo/yr
Electricity Fees $24,291 -
LPG $49,403 2,396
MMBtu
Fuel Oil #2 $117,941 7,530
MMBtu
TOTAL YEARLY COSTS $336,256
RECOMMENDED SAVINGS* $133,657 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $133,657

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.7261: Install timers and/or thermostats $7,603 - $1,026
12,213
kWh
- $6,577
-
MMBtu
-
02 2.2437: Recover waste heat from equipment $5,873 $6,000 - - $5,873
-
MMBtu
-
03 2.4221: Install compressor air intakes in coolest locations $1,670 $2,500 $1,290
15,355
kWh
$380
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $11,910 $23,990 $9,508
113,183
kWh
$2,402
-
kW-mo/yr
- -
05 2.7232: Replace existing hvac unit with high efficiency model $1,805 $5,500 $1,393
16,579
kWh
$412
-
kW-mo/yr
- -
06 2.4226: Use / purchase optimum sized compressor $16,879 $51,500 $13,034
155,168
kWh
$3,845
-
kW-mo/yr
- -
07 2.1331: Burn a less expensive grade of fuel $87,917 $290,000 - - - $87,917
TOTAL RECOMMENDED $133,657 $379,490 $26,251
312,498
kWh
$7,039
-
kW-mo/yr
$12,450
-
MMBtu
$87,917
TOTAL IMPLEMENTED $133,657 $379,490 $26,251
312,498
kWh
$7,039
-
kW-mo/yr
$12,450
-
MMBtu
$87,917
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs