Assessment Year | 2019 |
---|---|
Principal Product | Electrical Equipment |
NAICS | 335931: Current-Carrying Wiring Device Manufacturing |
SIC | 3643: Current-Carrying Wiring Devices |
Sales Range | $10 M to 50M |
# of Employees | 47 |
Plant Area |
180,000
ft2
|
Annual Production | 50,000
units
|
Production Hrs. Annual | 2,600
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $28,335 | 493,780 |
kWh
|
$0.057 |
Electricity Demand | $14,854 | 1,975 |
kW-mo/yr
|
$7.52 |
Electricity Fees | $50,587 | - |
|
- |
Natural Gas | $38,815 | 3,360 |
MMBtu
|
$11.55 |
TOTAL YEARLY COSTS | $132,591 | |||
RECOMMENDED SAVINGS* | $22,775 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,774 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7263: Lower compressor pressure through a/c system modification | $200 | $40 |
$125
2,197
kWh
|
$75
-
kW-mo/yr
|
- | - | |
02 | 2.4226: Use / purchase optimum sized compressor | $6,044 | $11,000 |
$491
8,620
kWh
|
$301
-
kW-mo/yr
|
- | $5,252 | |
03 | 2.7243: Improve air circulation with destratification fans / other methods | $6,352 | $12,000 |
$718
12,607
kWh
|
$436
-
kW-mo/yr
|
$5,198
-
MMBtu
|
- | |
04 | 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $5,605 | $12,900 |
$(-66.0)
(-1,164)
kWh
|
$(-323.0)
-
kW-mo/yr
|
$5,994
-
MMBtu
|
- | |
05 | 2.7233: Use properly designed and sized hvac equipment | $4,574 | $20,000 | - | - |
$4,574
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $22,775 | $55,940 |
$1,268
22,260
kWh
|
$489
-
kW-mo/yr
|
$15,766
-
MMBtu
|
$5,252 | ||
TOTAL IMPLEMENTED | $4,774 | $20,040 |
$125
2,197
kWh
|
$75
-
kW-mo/yr
|
$4,574
-
MMBtu
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs