| Assessment Year | 2019 |
|---|---|
| Principal Product | Electrical Equipment |
| NAICS | 335931: Current-Carrying Wiring Device Manufacturing |
| SIC | 3643: Current-Carrying Wiring Devices |
| Sales Range | $10 M to 50M |
| # of Employees | 47 |
| Plant Area |
180,000
ft2
|
| Annual Production | 50,000
units
|
| Production Hrs. Annual | 2,600
hrs
|
| Location (State) | New Jersey |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $28,335 | 493,780 |
kWh
|
$0.057 |
| Electricity Demand | $14,854 | 1,975 |
kW-mo/yr
|
$7.52 |
| Electricity Fees | $50,587 | - |
|
- |
| Natural Gas | $38,815 | 3,360 |
MMBtu
|
$11.55 |
| TOTAL YEARLY COSTS | $132,591 | |||
| RECOMMENDED SAVINGS* | $22,775 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $4,774 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7263: Lower compressor pressure through a/c system modification | $200 | $40 |
$125
2,197
kWh
|
$75
-
kW-mo/yr
|
- | - | |
| 02 | 2.4226: Use / purchase optimum sized compressor | $6,044 | $11,000 |
$491
8,620
kWh
|
$301
-
kW-mo/yr
|
- | $5,252 | |
| 03 | 2.7243: Improve air circulation with destratification fans / other methods | $6,352 | $12,000 |
$718
12,607
kWh
|
$436
-
kW-mo/yr
|
$5,198
-
MMBtu
|
- | |
| 04 | 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $5,605 | $12,900 |
$(-66.0)
(-1,164)
kWh
|
$(-323.0)
-
kW-mo/yr
|
$5,994
-
MMBtu
|
- | |
| 05 | 2.7233: Use properly designed and sized hvac equipment | $4,574 | $20,000 | - | - |
$4,574
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $22,775 | $55,940 |
$1,268
22,260
kWh
|
$489
-
kW-mo/yr
|
$15,766
-
MMBtu
|
$5,252 | ||
| TOTAL IMPLEMENTED | $4,774 | $20,040 |
$125
2,197
kWh
|
$75
-
kW-mo/yr
|
$4,574
-
MMBtu
|
- | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs