ITAC Assessment: LE0467
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Zinc Die Casting
NAICS 331523: Nonferrous Metal Die-Casting Foundries
SIC 3364: Nonferrous Die-Castings, Except Aluminum
Sales Range $10
M
to 50
M
# of Employees 83
Plant Area 50,000
ft2
Annual Production 5,000,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $168,089 1,606,336
kWh
Electricity Demand $61,260 7,006
kW-mo/yr
Electricity Fees $7,204 -
Natural Gas $161,814 19,022
MMBtu
TOTAL YEARLY COSTS $398,367
RECOMMENDED SAVINGS* $78,506 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,883

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7261: Install timers and/or thermostats $825 $70 $272
2,592
kWh
- $553
-
MMBtu
-
02 2.4226: Use / purchase optimum sized compressor $40,407 $37,000 $33,896
322,820
kWh
$6,511
-
kW-mo/yr
- -
03 2.4221: Install compressor air intakes in coolest locations $1,990 $2,000 $1,789
17,038
kWh
$201
-
kW-mo/yr
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,116 $6,000 $2,644
25,178
kWh
$472
-
kW-mo/yr
- -
05 2.7233: Use properly designed and sized hvac equipment $14,748 $50,000 - - $14,748
-
MMBtu
-
06 2.2442: Preheat combustion air with waste heat $9,352 $35,000 - - $9,352
-
MMBtu
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $7,568 $30,054 $6,432
61,256
kWh
$1,136
-
kW-mo/yr
- -
08 2.4321: Upgrade obsolete equipment $500 $5,000 - - - $500
TOTAL RECOMMENDED $78,506 $165,124 $45,033
428,884
kWh
$8,320
-
kW-mo/yr
$24,653
-
MMBtu
$500
TOTAL IMPLEMENTED $10,883 $37,124 $8,493
80,886
kWh
$1,337
-
kW-mo/yr
$553
-
MMBtu
$500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs