ITAC Assessment: LE0419
ITAC logo
ITAC Assessment: LE0419
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product PVC based products
NAICS 326121: Unlaminated Plastics Profile Shape Manufacturing
SIC 3082: Unsupported Plastics Profile Shapes
Sales Range $50
M
to 100
M
# of Employees 239
Plant Area 184,540
ft2
Annual Production 4,500,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,807,365 29,139,662
kWh
Electricity Demand $469,709 57,387
kW-mo/yr
Electricity Fees $10,805 -
Natural Gas $26,625 3,301
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $251,533 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $196,959

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,334 $1,000 $4,352
70,194
kWh
$982
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $43,060 $25,900 $37,416
603,479
kWh
$5,644
-
kW-mo/yr
-
03 2.7261: Install timers and/or thermostats $2,202 $1,830 $1,249
20,153
kWh
- $952
-
MMBtu
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $66,277 $63,000 $56,453
910,531
kWh
$9,824
-
kW-mo/yr
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $52,235 $60,700 $45,388
732,062
kWh
$6,847
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $38,176 $61,332 $32,123
518,112
kWh
$6,053
-
kW-mo/yr
-
07 2.4226: Use / purchase optimum sized compressor $41,911 $70,000 $35,490
572,412
kWh
$6,421
-
kW-mo/yr
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $2,339 $8,602 $1,374
22,163
kWh
$965
-
kW-mo/yr
-
TOTAL RECOMMENDED $251,533 $292,364 $213,845
3,449,106
kWh
$36,736
-
kW-mo/yr
$952
-
MMBtu
TOTAL IMPLEMENTED $196,959 $223,062 $167,083
2,694,881
kWh
$28,924
-
kW-mo/yr
$952
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs