ITAC Assessment: LE0408
ITAC logo
ITAC Assessment: LE0408
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Asphalt Products
NAICS 324122: Asphalt Shingle and Coating Materials Manufacturing
SIC 2952: Asphalt Felts and Coatings
Sales Range $1
M
to 5
M
# of Employees 15
Plant Area 70,000
ft2
Annual Production 45,000
ton
Production Hrs. Annual 4,160
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $478,381 5,634,214
kWh
Electricity Demand $90,774 15,976
kW-mo/yr
Natural Gas $1,129,299 187,247
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $470,268 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $97,020

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.6218: Turn off equipment when not in use $34,913 $25 $34,913
410,739
kWh
- - -
02 2.2113: Repair or replace steam traps $28,076 $1,125 - - $28,076
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,093 $1,000 $11,003
129,443
kWh
$1,091
-
kW-mo/yr
- -
04 2.7261: Install timers and/or thermostats $190 $25 $46
538
kWh
- $145
-
MMBtu
-
05 2.2443: Re-use or recycle hot or cold process exhaust air $293,975 $56,000 - - $293,975
-
MMBtu
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $11,005 $4,800 - - $11,005
-
MMBtu
-
07 2.2414: Use waste heat from hot flue gases to preheat $10,070 $10,080 - - $10,070
-
MMBtu
-
08 2.4226: Use / purchase optimum sized compressor $69,013 $99,925 $63,208
743,628
kWh
$5,805
-
kW-mo/yr
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $10,933 $45,975 $7,574
89,107
kWh
$1,392
-
kW-mo/yr
- $1,967
TOTAL RECOMMENDED $470,268 $218,955 $116,744
1,373,455
kWh
$8,287
-
kW-mo/yr
$343,270
-
MMBtu
$1,967
TOTAL IMPLEMENTED $97,020 $52,925 $53,490
629,289
kWh
$2,482
-
kW-mo/yr
$39,081
-
MMBtu
$1,967
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs