ITAC Assessment: LE0403
ITAC logo
ITAC Assessment: LE0403
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Contract Manufacturing
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 43
Plant Area 18,071
ft2
Annual Production 55,935
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $46,682 788,235
kWh
Electricity Demand $9,494 1,914
kW-mo/yr
Electricity Fees $25,471 -
Natural Gas $12,234 1,076
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,139 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,933

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.7261: Install timers and/or thermostats $1,886 - $442
7,485
kWh
- $1,444
-
MMBtu
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,107 $25 $2,785
47,204
kWh
$322
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $215 $113 $110
1,868
kWh
$105
-
kW-mo/yr
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,849 $3,330 $4,432
75,116
kWh
$417
-
kW-mo/yr
- -
05 2.4221: Install compressor air intakes in coolest locations $560 $520 $500
8,469
kWh
$60
-
kW-mo/yr
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $596 $600 $634
10,753
kWh
$(-37.7)
-
kW-mo/yr
- -
07 2.7261: Install timers and/or thermostats $522 $625 $238
4,037
kWh
- $284
-
MMBtu
-
08 2.7135: Install occupancy sensors $876 $1,943 $790
13,390
kWh
$50
-
kW-mo/yr
- $36
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,928 $5,333 $1,730
29,327
kWh
$198
-
kW-mo/yr
- -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $990 $3,075 $376
6,365
kWh
$84
-
kW-mo/yr
- $530
11 2.2437: Recover waste heat from equipment $489 $1,750 - - $489
-
MMBtu
-
12 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $120 $612 $108
1,824
kWh
$12
-
kW-mo/yr
- -
TOTAL RECOMMENDED $16,139 $17,926 $12,145
205,838
kWh
$1,210
-
kW-mo/yr
$2,217
-
MMBtu
$566
TOTAL IMPLEMENTED $10,933 $5,411 $8,559
145,063
kWh
$894
-
kW-mo/yr
$1,444
-
MMBtu
$36
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs