ITAC Assessment: LE0393
ITAC logo
ITAC Assessment: LE0393
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Garage doors and truck
NAICS 332321: Metal Window and Door Manufacturing
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $10
M
to 50
M
# of Employees 82
Plant Area 100,000
ft2
Annual Production 43,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $74,965 986,096
kWh
Electricity Demand $23,957 4,830
kW-mo/yr
Electricity Fees $17,189 -
Natural Gas $23,079 7,152
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,679 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,445 $25 $1,048
13,793
kWh
$397
-
kW-mo/yr
- -
02 2.7261: Install timers and/or thermostats $4,240 $1,125 - - $4,240
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,825 $1,000 $2,051
26,987
kWh
$774
-
kW-mo/yr
- -
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $130 $75 $130
1,712
kWh
- - -
05 2.4221: Install compressor air intakes in coolest locations $181 $365 $121
1,597
kWh
$60
-
kW-mo/yr
- -
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,198 $3,052 - $1,198
-
kW-mo/yr
- -
07 2.7135: Install occupancy sensors $15,747 $40,880 $11,189
147,230
kWh
$4,211
-
kW-mo/yr
- $347
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,275 $4,018 $893
11,748
kWh
$337
-
kW-mo/yr
- $45
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,261 $11,400 $2,368
31,155
kWh
$893
-
kW-mo/yr
- -
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $311 $1,313 $28
372
kWh
$283
-
kW-mo/yr
- -
11 2.4221: Install compressor air intakes in coolest locations $66 $289 - - $66
-
MMBtu
-
TOTAL RECOMMENDED $30,679 $63,542 $17,829
234,594
kWh
$8,152
-
kW-mo/yr
$4,306
-
MMBtu
$392
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs