| Assessment Year | 2009 |
|---|---|
| Principal Product | Aircraft Engine & Turbine Generator Controls |
| NAICS | 336412: Aircraft Engine and Engine Parts Manufacturing |
| SIC | 3724: Aircraft Engines and Engine Parts |
| Sales Range | $100 M to 500M |
| # of Employees | 600 |
| Plant Area |
200,000
ft2
|
| Annual Production | 300,000
pieces
|
| Production Hrs. Annual | 6,120
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $398,234 | 12,527,136 |
kWh
|
$0.032 |
| Electricity Demand | $324,179 | 35,610 |
kW-mo/yr
|
$9.10 |
| Electricity Fees | $3,360 | - |
|
- |
| Natural Gas | $121,648 | 14,674 |
MMBtu
|
$8.29 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $40,430 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $39,640 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.6212: Turn off equipment during breaks, reduce operating time | $37,130 | $140,000 |
$37,130
1,114,000
kWh
|
- | - | - | |
| 02 | 2.4133: Use most efficient type of electric motors | $270 | $580 |
$190
5,634
kWh
|
$80
-
kW-mo/yr
|
- | - | |
| 03 | 2.7134: Use photocell controls | $1,710 | $20,000 |
$970
29,000
kWh
|
$380
-
kW-mo/yr
|
$110 | $250 | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $790 | $2,150 |
$90
2,600
kWh
|
$40
-
kW-mo/yr
|
$370 | $290 | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $530 | $400 |
$240
7,300
kWh
|
$100
-
kW-mo/yr
|
$160 | $30 | |
| TOTAL RECOMMENDED | $40,430 | $163,130 |
$38,620
1,158,534
kWh
|
$600
-
kW-mo/yr
|
$640 | $570 | ||
| TOTAL IMPLEMENTED | $39,640 | $160,980 |
$38,530
1,155,934
kWh
|
$560
-
kW-mo/yr
|
$270 | $280 | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs