ITAC Assessment: CO0619
ITAC logo
ITAC Assessment: CO0619
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Aircraft Engine & Turbine Generator Controls
NAICS 336412: Aircraft Engine and Engine Parts Manufacturing
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $100
M
to 500
M
# of Employees 600
Plant Area 200,000
ft2
Annual Production 300,000
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $398,234 12,527,136
kWh
Electricity Demand $324,179 35,610
kW-mo/yr
Electricity Fees $3,360 -
Natural Gas $121,648 14,674
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,430 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,640

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $37,130 $140,000 $37,130
1,114,000
kWh
- - -
02 2.4133: Use most efficient type of electric motors $270 $580 $190
5,634
kWh
$80
-
kW-mo/yr
- -
03 2.7134: Use photocell controls $1,710 $20,000 $970
29,000
kWh
$380
-
kW-mo/yr
$110 $250
04 2.7142: Utilize higher efficiency lamps and/or ballasts $790 $2,150 $90
2,600
kWh
$40
-
kW-mo/yr
$370 $290
05 2.7142: Utilize higher efficiency lamps and/or ballasts $530 $400 $240
7,300
kWh
$100
-
kW-mo/yr
$160 $30
TOTAL RECOMMENDED $40,430 $163,130 $38,620
1,158,534
kWh
$600
-
kW-mo/yr
$640 $570
TOTAL IMPLEMENTED $39,640 $160,980 $38,530
1,155,934
kWh
$560
-
kW-mo/yr
$270 $280
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs