ITAC Assessment: LE0392
ITAC logo
ITAC Assessment: LE0392
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Medical Packaging
NAICS 326112: Plastics Packaging Film and Sheet (including Laminated) Manufacturing
SIC 2671: Packaging Paper and Plastics Film, Coated and Laminated
Sales Range $100
M
to 500
M
# of Employees 70
Plant Area 98,000
ft2
Annual Production 80,000
ton
Production Hrs. Annual 7,488
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $262,639 3,490,895
kWh
Electricity Demand $33,514 8,766
kW-mo/yr
Electricity Fees $31,022 -
Natural Gas $33,421 3,208
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $90,463 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $12,575 - - - - $12,575 -
02 2.7135: Install occupancy sensors $3,578 $240 $3,578
47,713
kWh
- - - -
03 2.4323: Use optimum size and capacity equipment $4,436 $700 $4,436
59,146
kWh
- - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,170 $520 $1,090
14,536
kWh
$80
-
kW-mo/yr
- - -
05 2.2437: Recover waste heat from equipment $2,407 $1,210 - - $2,407
-
MMBtu
- -
06 2.4221: Install compressor air intakes in coolest locations $887 $468 $581
7,750
kWh
$306
-
kW-mo/yr
- - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,042 $8,300 $7,434
99,125
kWh
$607
-
kW-mo/yr
- - -
08 2.1311: Replace electrically-operated equipment with fossil fuel equipment $18,703 $21,975 $38,245
509,933
kWh
$3,122
-
kW-mo/yr
$(-22,663.5)
-
MMBtu
- -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $756 $1,000 $695
9,269
kWh
$61
-
kW-mo/yr
- - -
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,627 $18,400 $8,981
119,743
kWh
$1,646
-
kW-mo/yr
- - -
11 2.7261: Install timers and/or thermostats $1,082 $2,210 $498
6,646
kWh
- $584
-
MMBtu
- -
12 2.7142: Utilize higher efficiency lamps and/or ballasts $609 $1,733 $443
5,913
kWh
$118
-
kW-mo/yr
- - $47
13 2.4226: Use / purchase optimum sized compressor $20,472 $70,000 $18,929
252,382
kWh
$1,543
-
kW-mo/yr
- - -
14 2.7232: Replace existing hvac unit with high efficiency model $2,425 $10,000 $1,141
15,216
kWh
$294
-
kW-mo/yr
$990
-
MMBtu
- -
15 2.7142: Utilize higher efficiency lamps and/or ballasts $2,693 $13,275 $2,049
27,322
kWh
$535
-
kW-mo/yr
- - $108
TOTAL RECOMMENDED $90,463 $150,031 $88,102
1,174,694
kWh
$8,313
-
kW-mo/yr
$(-18,683.1)
-
MMBtu
$12,575 $156
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs