Assessment Year | 2015 |
---|---|
Principal Product | Medical Packaging |
NAICS | 326112: Plastics Packaging Film and Sheet (including Laminated) Manufacturing |
SIC | 2671: Packaging Paper and Plastics Film, Coated and Laminated |
Sales Range | $100 M to 500M |
# of Employees | 70 |
Plant Area |
98,000
ft2
|
Annual Production | 80,000
ton
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $262,639 | 3,490,895 |
kWh
|
$0.075 |
Electricity Demand | $33,514 | 8,766 |
kW-mo/yr
|
$3.82 |
Electricity Fees | $31,022 | - |
|
- |
Natural Gas | $33,421 | 3,208 |
MMBtu
|
$10.42 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $90,463 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.8114: Change rate schedules or other changes in utility service | $12,575 | - | - | - | - | $12,575 | - | |
02 | 2.7135: Install occupancy sensors | $3,578 | $240 |
$3,578
47,713
kWh
|
- | - | - | - | |
03 | 2.4323: Use optimum size and capacity equipment | $4,436 | $700 |
$4,436
59,146
kWh
|
- | - | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,170 | $520 |
$1,090
14,536
kWh
|
$80
-
kW-mo/yr
|
- | - | - | |
05 | 2.2437: Recover waste heat from equipment | $2,407 | $1,210 | - | - |
$2,407
-
MMBtu
|
- | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $887 | $468 |
$581
7,750
kWh
|
$306
-
kW-mo/yr
|
- | - | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,042 | $8,300 |
$7,434
99,125
kWh
|
$607
-
kW-mo/yr
|
- | - | - | |
08 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $18,703 | $21,975 |
$38,245
509,933
kWh
|
$3,122
-
kW-mo/yr
|
$(-22,663.5)
-
MMBtu
|
- | - | |
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $756 | $1,000 |
$695
9,269
kWh
|
$61
-
kW-mo/yr
|
- | - | - | |
10 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $10,627 | $18,400 |
$8,981
119,743
kWh
|
$1,646
-
kW-mo/yr
|
- | - | - | |
11 | 2.7261: Install timers and/or thermostats | $1,082 | $2,210 |
$498
6,646
kWh
|
- |
$584
-
MMBtu
|
- | - | |
12 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $609 | $1,733 |
$443
5,913
kWh
|
$118
-
kW-mo/yr
|
- | - | $47 | |
13 | 2.4226: Use / purchase optimum sized compressor | $20,472 | $70,000 |
$18,929
252,382
kWh
|
$1,543
-
kW-mo/yr
|
- | - | - | |
14 | 2.7232: Replace existing hvac unit with high efficiency model | $2,425 | $10,000 |
$1,141
15,216
kWh
|
$294
-
kW-mo/yr
|
$990
-
MMBtu
|
- | - | |
15 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,693 | $13,275 |
$2,049
27,322
kWh
|
$535
-
kW-mo/yr
|
- | - | $108 | |
TOTAL RECOMMENDED | $90,463 | $150,031 |
$88,102
1,174,694
kWh
|
$8,313
-
kW-mo/yr
|
$(-18,683.1)
-
MMBtu
|
$12,575 | $156 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs