ITAC Assessment: AM0227
ITAC logo
ITAC Assessment: AM0227
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Air cooled heat exchangers
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $50
M
to 100
M
# of Employees 265
Plant Area 248,855
ft2
Annual Production 5,570
thousand feet
Production Hrs. Annual 2,510
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $499,711 6,979,484
kWh
Natural Gas $109,655 33,294
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,930 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,930

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (haz) Savings
01 3.7134: Wash and reuse rags on-site $25,010 $7,900 - - $25,010
-
lb
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,750 $2,400 $4,750
115,768
kWh
- -
03 2.2121: Increase amount of condensate returned $1,790 $2,800 - $1,790
-
MMBtu
-
04 2.7134: Use photocell controls $950 $285 $950
13,775
kWh
- -
05 2.7124: Make a practice of turning off lights when not needed $260 - $260
6,155
kWh
- -
06 2.4314: Use synthetic lubricant $170 - $170
2,345
kWh
- -
TOTAL RECOMMENDED $32,930 $13,385 $6,130
138,043
kWh
$1,790
-
MMBtu
$25,010
-
lb
TOTAL IMPLEMENTED $32,930 $13,385 $6,130
138,043
kWh
$1,790
-
MMBtu
$25,010
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs