ITAC Assessment: LE0384
ITAC logo
ITAC Assessment: LE0384
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Instruments
NAICS 334514: Totalizing Fluid Meter and Counting Device Manufacturing
SIC 3829: Measuring and Controlling Devices, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 272
Plant Area 131,500
ft2
Annual Production 50,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $771,850 7,844,000
kWh
Electricity Demand $71,681 6,106
kW-mo/yr
Electricity Fees $6,074 -
Natural Gas $10,664 947
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $74,160 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,852

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,262 $250 $1,086
11,079
kWh
$176
-
kW-mo/yr
- -
02 2.7111: Reduce illumination to minimum necessary levels $2,272 $1,481 $1,689
17,239
kWh
$583
-
kW-mo/yr
- -
03 2.7212: Install or upgrade insulation on hvac distribution systems $1,284 $1,010 $1,284
13,100
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,878 $2,080 $1,183
12,073
kWh
$693
-
kW-mo/yr
- $2
05 2.7233: Use properly designed and sized hvac equipment $46,884 $80,000 $46,661
476,130
kWh
$223
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,875 $3,304 $1,357
13,844
kWh
$470
-
kW-mo/yr
- $48
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,620 $12,950 $1,427
14,560
kWh
$789
-
kW-mo/yr
- $404
08 2.7261: Install timers and/or thermostats $3,342 $234 $3,342
34,104
kWh
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $5,397 $30,000 $1,755
17,909
kWh
$575
-
kW-mo/yr
- $3,067
10 2.7441: Replace broken windows and/or window sash $7,346 $551,550 - - $7,346
-
MMBtu
-
TOTAL RECOMMENDED $74,160 $682,859 $59,784
610,038
kWh
$3,509
-
kW-mo/yr
$7,346
-
MMBtu
$3,521
TOTAL IMPLEMENTED $22,852 $599,519 $9,570
97,656
kWh
$2,417
-
kW-mo/yr
$7,346
-
MMBtu
$3,519
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs