ITAC Assessment: LE0374
ITAC logo
ITAC Assessment: LE0374
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Roller and Spherical Bearings
NAICS 332991: Ball and Roller Bearing Manufacturing
SIC 3562: Ball and Roller Bearings
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 71,800
ft2
Annual Production 200,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $342,935 2,507,009
kWh
Natural Gas $19,965 2,040
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $110,079 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $6,907 $48 $6,907
50,417
kWh
- -
02 2.7261: Install timers and/or thermostats $1,034 $48 - $1,034
-
MMBtu
-
03 2.4221: Install compressor air intakes in coolest locations $2,422 $393 $2,422
17,678
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,587 $1,000 $4,587
33,482
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $589 $166 $589
4,297
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $40,789 $57,000 $39,456
288,000
kWh
- $1,333
07 2.7142: Utilize higher efficiency lamps and/or ballasts $6,426 $9,048 $6,309
46,051
kWh
- $117
08 2.4226: Use / purchase optimum sized compressor $45,444 $72,000 $45,444
331,704
kWh
- -
09 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,123 $2,050 $1,622
11,840
kWh
$(-499.0)
-
MMBtu
-
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $291 $877 $291
2,120
kWh
- -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $468 $1,698 $468
3,416
kWh
- -
TOTAL RECOMMENDED $110,079 $144,328 $108,094
789,005
kWh
$535
-
MMBtu
$1,450
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs