Assessment Year | 2014 |
---|---|
Principal Product | Coated, Laminated and Metallized Films |
NAICS | 326113: Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing |
SIC | 3081: Unsupported Plastics Film and Sheet |
Sales Range | $10 M to 50M |
# of Employees | 95 |
Plant Area |
62,000
ft2
|
Annual Production | 30,000
thousand feet
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $173,949 | 3,098,091 |
kWh
|
$0.056 |
Electricity Demand | $33,362 | 7,471 |
kW-mo/yr
|
$4.47 |
Electricity Fees | $28,135 | - |
|
- |
Natural Gas | $125,260 | 22,418 |
MMBtu
|
$5.59 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $87,597 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,983 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7273: Install desiccant humidity control system | $465 | $30 |
$465
8,300
kWh
|
- | - | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $857 | $134 |
$759
13,548
kWh
|
$98
-
kW-mo/yr
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,294 | $1,500 |
$2,968
52,997
kWh
|
$326
-
kW-mo/yr
|
- | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,320 | $520 |
$1,141
20,378
kWh
|
$179
-
kW-mo/yr
|
- | - | |
05 | 2.2437: Recover waste heat from equipment | $4,601 | $1,870 | - | - |
$4,601
-
MMBtu
|
- | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $8,173 | $5,400 | - | - |
$8,173
-
MMBtu
|
- | |
07 | 2.4226: Use / purchase optimum sized compressor | $7,519 | $6,700 |
$7,332
130,923
kWh
|
$188
-
kW-mo/yr
|
- | - | |
08 | 2.7261: Install timers and/or thermostats | $645 | $711 |
$645
11,513
kWh
|
- | - | - | |
09 | 2.2443: Re-use or recycle hot or cold process exhaust air | $24,930 | $41,000 | - | - |
$24,930
-
MMBtu
|
- | |
10 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $7,402 | $13,500 |
$6,616
118,138
kWh
|
$787
-
kW-mo/yr
|
- | - | |
11 | 2.1221: Replace obsolete burners with more efficient ones | $9,045 | $16,500 | - | - |
$9,045
-
MMBtu
|
- | |
12 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $96 | $210 |
$78
1,397
kWh
|
$18
-
kW-mo/yr
|
- | - | |
13 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,361 | $7,792 |
$1,892
33,779
kWh
|
$402
-
kW-mo/yr
|
- |
$1,067
-
Tgal
|
|
14 | 2.2136: Install / repair insulation on steam lines | $2,482 | $4,118 | - | - |
$2,482
-
MMBtu
|
- | |
15 | 2.7232: Replace existing hvac unit with high efficiency model | $13,408 | $64,631 |
$11,593
207,020
kWh
|
$1,815
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $87,597 | $164,616 |
$33,488
597,993
kWh
|
$3,813
-
kW-mo/yr
|
$49,230
-
MMBtu
|
$1,067
-
Tgal
|
||
TOTAL IMPLEMENTED | $12,983 | $18,711 |
$3,613
64,510
kWh
|
$326
-
kW-mo/yr
|
$9,045
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs