Assessment Year | 2003 |
---|---|
Principal Product | Pre-Colored Plastics and Plastic Color Concentrates |
NAICS | 325130: Synthetic Dye and Pigment Manufacturing |
SIC | 2816: Inorganic Pigments |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
100,000
ft2
|
Annual Production | 36,000,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $686,938 | 9,789,600 |
kWh
|
$0.070 |
Electricity Demand | $221,654 | 21,161 |
kW-mo/yr
|
$10.47 |
Electricity Fees | $93,582 | - |
|
- |
Natural Gas | $124,762 | 18,633 |
MMBtu
|
$6.70 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $219,989 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $194,192 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 4.111: Add equipment/ operators to reduce production bottleneck | $142,452 | $31,500 |
$7,347
104,697
kWh
|
$2,105
-
kW-mo/yr
|
- | $13,000 | $120,000 | |
02 | 2.2511: Insulate bare equipment | $20,715 | $4,565 |
$16,095
229,390
kWh
|
$4,620
-
kW-mo/yr
|
- | - | - | |
03 | 2.4239: Eliminate or reduce compressed air usage | $24,928 | $520 |
$19,368
276,011
kWh
|
$5,560
-
kW-mo/yr
|
- | - | - | |
04 | 2.7229: Air condition only space necessary | $13,955 | $6,000 | - | - |
$13,955
-
MMBtu
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $12,857 | $150 |
$9,988
142,340
kWh
|
$2,869
-
kW-mo/yr
|
- | - | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $5,082 | $100 |
$3,229
46,019
kWh
|
$1,853
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $219,989 | $42,835 |
$56,027
798,457
kWh
|
$17,007
-
kW-mo/yr
|
$13,955
-
MMBtu
|
$13,000 | $120,000 | ||
TOTAL IMPLEMENTED | $194,192 | $38,170 |
$36,703
523,048
kWh
|
$10,534
-
kW-mo/yr
|
$13,955
-
MMBtu
|
$13,000 | $120,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs