ITAC Assessment: AR0038
ITAC logo
ITAC Assessment: AR0038
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Electric Motors
NAICS
n/a
SIC 3621: Motors and Generators
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 112,000
ft2
Annual Production 28,600
pieces
Production Hrs. Annual 6,570
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $536,003 7,778,429
kWh
Natural Gas $19,835 4,783
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,866 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,875

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,079 $300 $4,079
59,203
kWh
- -
02 2.4221: Install compressor air intakes in coolest locations $2,118 $200 $2,118
30,774
kWh
- -
03 2.7245: Use direct air supply to exhaust hoods $4,094 $2,000 $4,094
123,681
kWh
- -
04 2.7111: Reduce illumination to minimum necessary levels $4,584 $220 $4,584
66,530
kWh
- -
05 2.4134: Replace electric motor with fossil fuel engine $20,991 $30,000 $38,134
553,341
kWh
$(-12,143.0)
-
MMBtu
$(-5,000.0)
TOTAL RECOMMENDED $35,866 $32,720 $53,009
833,529
kWh
$(-12,143.0)
-
MMBtu
$(-5,000.0)
TOTAL IMPLEMENTED $14,875 $2,720 $14,875
280,188
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs