ITAC Assessment: LE0367
ITAC logo
ITAC Assessment: LE0367
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Mass Standards & Lab Equipment
NAICS 334516: Analytical Laboratory Instrument Manufacturing
SIC 3821: Laboratory Apparatus and Furniture
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 47,000
ft2
Annual Production 124,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $166,319 1,548,160
kWh
Electricity Demand $21,812 4,573
kW-mo/yr
Electricity Fees $51,451 -
Natural Gas $8,356 841
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,579 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,440

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,354 $9,800 $2,923
27,315
kWh
$31
-
kW-mo/yr
- $1,400
02 2.7142: Utilize higher efficiency lamps and/or ballasts $18,213 $15,750 $16,395
153,223
kWh
$1,483
-
kW-mo/yr
- $335
03 2.7261: Install timers and/or thermostats $1,711 - $2,219
20,736
kWh
$277
-
kW-mo/yr
$(-785.0)
-
MMBtu
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,606 $15,100 $12,208
114,094
kWh
$1,398
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,516 $1,350 $4,053
37,881
kWh
$463
-
kW-mo/yr
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,165 $16,000 $3,736
34,913
kWh
$429
-
kW-mo/yr
- -
07 2.4221: Install compressor air intakes in coolest locations $1,515 $500 $1,334
12,469
kWh
$181
-
kW-mo/yr
- -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,499 $990 $1,925
17,992
kWh
$1,574
-
kW-mo/yr
- -
TOTAL RECOMMENDED $51,579 $59,490 $44,793
418,623
kWh
$5,836
-
kW-mo/yr
$(-785.0)
-
MMBtu
$1,735
TOTAL IMPLEMENTED $24,440 $17,100 $22,667
211,840
kWh
$2,223
-
kW-mo/yr
$(-785.0)
-
MMBtu
$335
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs