Assessment Year | 2013 |
---|---|
Principal Product | Pumps |
NAICS | 333911: Pump and Pumping Equipment Manufacturing |
SIC | 3561: Pumps and Pumping Equipment |
Sales Range | $50 M to 100M |
# of Employees | 99 |
Plant Area |
100,000
ft2
|
Annual Production | 21,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $165,005 | 2,607,983 |
kWh
|
$0.063 |
Electricity Demand | $69,331 | 31,214 |
kW-mo/yr
|
$2.22 |
Electricity Fees | $26,053 | - |
|
- |
Natural Gas | $23,245 | 2,025 |
MMBtu
|
$11.48 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $50,966 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,023 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $6,254 | $26,400 |
$5,844
92,767
kWh
|
$282
-
kW-mo/yr
|
- | $128 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,383 | $11,830 |
$3,161
50,181
kWh
|
$366
-
kW-mo/yr
|
- | $856 | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $803 | $1,900 | - | - |
$803
-
MMBtu
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $2,970 | $2,640 |
$2,797
44,392
kWh
|
$173
-
kW-mo/yr
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $15,537 | $5,280 |
$11,568
183,620
kWh
|
$3,969
-
kW-mo/yr
|
- | - | |
06 | 2.7232: Replace existing hvac unit with high efficiency model | $4,029 | $9,000 |
$4,007
63,604
kWh
|
$22
-
kW-mo/yr
|
- | - | |
07 | 2.7261: Install timers and/or thermostats | $1,174 | $1,200 |
$1,174
18,542
kWh
|
- | - | - | |
08 | 2.7261: Install timers and/or thermostats | $13,937 | $25,932 |
$12,874
203,385
kWh
|
$1,063
-
kW-mo/yr
|
- | - | |
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,879 | $1,000 |
$1,710
27,138
kWh
|
$169
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $50,966 | $85,182 |
$43,135
683,629
kWh
|
$6,044
-
kW-mo/yr
|
$803
-
MMBtu
|
$984 | ||
TOTAL IMPLEMENTED | $6,023 | $4,840 |
$5,681
90,072
kWh
|
$342
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs