ITAC Assessment: TN0373
ITAC logo
ITAC Assessment: TN0373
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product SNACK FOODS
NAICS
n/a
SIC 2052: Cookies and Crackers
Sales Range $50
M
to 100
M
# of Employees 348
Plant Area
n/a
Annual Production 41,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $247,302 5,131,888
kWh
Natural Gas $115,944 36,116
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,289 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,824

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1212: Operate boilers on high fire setting $11,558 $20,160 - $11,558
-
MMBtu
-
02 2.7231: Use radiant heater for spot heating $7,050 $11,350 - $7,050
-
MMBtu
-
03 2.7123: Keep lamps and reflectors clean $8,465 $12,145 $7,990
166,471
kWh
- $475
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,164 $180 $4,164
86,753
kWh
- -
05 2.1233: Analyze flue gas for proper air/fuel ratio $46 - - $346
-
MMBtu
$(-300.0)
06 2.7142: Utilize higher efficiency lamps and/or ballasts $5,599 $1,800 $5,599
116,647
kWh
- -
07 2.4221: Install compressor air intakes in coolest locations $1,407 $540 $1,407
29,308
kWh
- -
TOTAL RECOMMENDED $38,289 $46,175 $19,160
399,179
kWh
$18,954
-
MMBtu
$175
TOTAL IMPLEMENTED $29,824 $34,030 $11,170
232,708
kWh
$18,954
-
MMBtu
$(-300.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs